{"id":16924,"date":"2024-09-30T07:54:59","date_gmt":"2024-09-30T07:54:59","guid":{"rendered":"https:\/\/teixeiraduarteconstrucao.com\/?post_type=tm_portfolio&#038;p=16924"},"modified":"2024-09-30T07:54:59","modified_gmt":"2024-09-30T07:54:59","slug":"rehabilitation-of-the-railway-branch-of-the-port-of-sines","status":"publish","type":"tm_portfolio","link":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/rehabilitation-of-the-railway-branch-of-the-port-of-sines\/","title":{"rendered":"Rehabilitation of the Railway Branch of the Port of Sines"},"content":{"rendered":"<h1>REHABILITATION OF THE RAILWAY BRANCH OF THE PORT OF SINES<\/h1>\n<p><strong>Client<\/strong>: APS \u2013 Administra\u00e7\u00e3o dos Portos de Sines e do Algarve, S.A.<br \/>\n<strong>Location<\/strong>: Terminal XXI \u2013 ZIL3 \u2013 TCS Terminal Contentores Sines \u2013 Portugal<br \/>\n<strong>Execution Period<\/strong>: 9 Months<\/p>\n<p>&nbsp;<\/p>\n<p>The works carried out in the railway branch of the port of Sines was part of the intervention to broaden the capacity of the reception \/ expedition hub, giving the said branch a higher capacity and performance and allowing for the operation of 750 m long trainsets. The main alterations to be introduced were the re-adjustment of the western side of the reception \/ expedition hub &#8211; in particular Line I that was given a length compatible with the operation of 750 m long trainsets; the creation of a 4th in the existing reception \/ expedition hub, parallel to Line III, with capacity to operate trainsets with the said length; the creation of the necessary infrastructure to allow, in the future, for the construction of a 5th Line, parallel to Line IV; the creation of a new access line that, beginning at the existing one will make it possible to connect to the new loading \/ unloading zone of the existing Terminal ; the creation of a connection the east end of the reception hub and the new access line; the creation of a new reversion end to replace the existing one; the creation of a new siding end to park rolling stock; and also the insertion of a TJD (transversal double junction) allowing for the connection between (siding \/ reception hub) and the future access lines and reversion line, as well as to the siding line.<\/p>\n<p>Main work quantities:<\/p>\n<p>Earthworks and Paving:<br \/>\nEarthworks: 97.930 m\u00b3<br \/>\nSub-ballast: 3.650 m\u00b3<\/p>\n<p>Drainage:<br \/>\nDitches, trenches, half-round, drains and collectors: 8.935 m<br \/>\nDrainage boxes and discharge outlets: 80 units<\/p>\n<p>Accessory Works:<br \/>\nLandscaping &#8211; Hydroseeding in two applications: 14.800 m<sup>2<\/sup><br \/>\nFences in variable wire mesh: 1.200 m<br \/>\nPublic lighting networks and lighting columns \/ towers; Infrastructure: 2.200 m<br \/>\nReinforced concrete walls and track buffer stop: 365 m\u00b3<\/p>\n<p>Signage and Safety Equipment:<br \/>\nTrenches and crossings with cable trays in prefabricated gutter \/ PEHD pipes: 4.960 m<br \/>\nEarthing network: 3.980 m<\/p>\n<p>Railway track:<br \/>\nTrack UIC 54\/ wood sleeper removal: 1.008 m<br \/>\nSupply and laying of track with 54E rail and multi-purpose monoblock sleepers: 2.211 m<br \/>\nSupply and laying of railroad switchers: 7 units<br \/>\nSupply of ballast and track ballasting: 12.000 tons<br \/>\nHeavy mechanical tamping, including dynamic stabilisation in open track: 6.194 m<br \/>\nExecution of aluminothermic welding in open track and TSD (track switching devices): 376 units<br \/>\nLevelling of long welded bar: 12.012 m<\/p>\n<p>Track Electrification:<br \/>\nCivil Works: Concrete in foundation footings and poles sealing: 350 m\u00b3<\/p>\n<p>Overhead Contact Line:<br \/>\nSupply and installation of catenary poles and flexible gantries: 120 units<br \/>\nSupply and installation of catenary (simple contact line): 3.410 m<br \/>\nSupply and installation of earthing systems: 2.427 m<\/p>\n<p>&nbsp;<\/p>\n<div id='gallery-1' class='gallery galleryid-16924 gallery-columns-2 gallery-size-large'><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/Ramal-Ferroviario-Sines-2-scaled.jpg'><img decoding=\"async\" width=\"847\" height=\"476\" data-src=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/Ramal-Ferroviario-Sines-2-1024x576.jpg\" class=\"attachment-large size-large lazyload\" alt=\"\" data-srcset=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/Ramal-Ferroviario-Sines-2-1024x576.jpg 1024w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/Ramal-Ferroviario-Sines-2-300x169.jpg 300w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/Ramal-Ferroviario-Sines-2-768x432.jpg 768w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/Ramal-Ferroviario-Sines-2-1536x864.jpg 1536w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/Ramal-Ferroviario-Sines-2-2048x1152.jpg 2048w\" data-sizes=\"(max-width: 847px) 100vw, 847px\" data-id=\"16919\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 847px; --smush-placeholder-aspect-ratio: 847\/476;\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/Ramal-Ferroviario-Sines-1-scaled.jpg'><img decoding=\"async\" width=\"847\" height=\"476\" data-src=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/Ramal-Ferroviario-Sines-1-1024x576.jpg\" class=\"attachment-large size-large lazyload\" alt=\"\" data-srcset=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/Ramal-Ferroviario-Sines-1-1024x576.jpg 1024w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/Ramal-Ferroviario-Sines-1-300x169.jpg 300w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/Ramal-Ferroviario-Sines-1-768x432.jpg 768w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/Ramal-Ferroviario-Sines-1-1536x864.jpg 1536w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/Ramal-Ferroviario-Sines-1-2048x1152.jpg 2048w\" data-sizes=\"(max-width: 847px) 100vw, 847px\" data-id=\"16917\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 847px; --smush-placeholder-aspect-ratio: 847\/476;\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/Ramal-Ferroviario-Sines-3-scaled.jpg'><img decoding=\"async\" width=\"847\" height=\"476\" data-src=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/Ramal-Ferroviario-Sines-3-1024x576.jpg\" class=\"attachment-large size-large lazyload\" alt=\"\" data-srcset=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/Ramal-Ferroviario-Sines-3-1024x576.jpg 1024w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/Ramal-Ferroviario-Sines-3-300x169.jpg 300w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/Ramal-Ferroviario-Sines-3-768x432.jpg 768w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/Ramal-Ferroviario-Sines-3-1536x864.jpg 1536w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/Ramal-Ferroviario-Sines-3-2048x1152.jpg 2048w\" data-sizes=\"(max-width: 847px) 100vw, 847px\" data-id=\"16921\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 847px; --smush-placeholder-aspect-ratio: 847\/476;\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/Ramal-Ferroviario-Sines-4-scaled.jpg'><img decoding=\"async\" width=\"847\" height=\"476\" data-src=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/Ramal-Ferroviario-Sines-4-1024x576.jpg\" class=\"attachment-large size-large lazyload\" alt=\"\" data-srcset=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/Ramal-Ferroviario-Sines-4-1024x576.jpg 1024w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/Ramal-Ferroviario-Sines-4-300x169.jpg 300w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/Ramal-Ferroviario-Sines-4-768x432.jpg 768w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/Ramal-Ferroviario-Sines-4-1536x864.jpg 1536w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/Ramal-Ferroviario-Sines-4-2048x1152.jpg 2048w\" data-sizes=\"(max-width: 847px) 100vw, 847px\" data-id=\"16923\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 847px; --smush-placeholder-aspect-ratio: 847\/476;\" \/><\/a>\n\t\t\t<\/div><\/figure>\n\t\t<\/div>\n\n","protected":false},"featured_media":16917,"template":"","projects":[329,387],"skills":[331,330],"countries":[333,332],"class_list":["post-16924","tm_portfolio","type-tm_portfolio","status-publish","has-post-thumbnail","hentry","tm_portfolio_category-railway-infrastructures","projects-all","projects-railway-infrastructures","skills-all","skills-rehabilitation","countries-all","countries-portugal-en"],"metadata":{"_wpml_word_count":"{\"total\":0,\"to_translate\":{\"en\":2,\"pt-pt\":2}}","_edit_lock":"1727683193:12","_edit_last":"12","_wpml_media_has_media":"1","_wpml_media_duplicate":"1","_wpml_media_featured":"1","_thumbnail_id":"16917","_last_translation_edit_mode":"native-editor","_reactive_geobox_preview":"{}","_themetechmount_metabox_group":{"slidertype":"","revslider":"home_PT","customslider":"","slider_width":"wide","custom_background":{"image":"","imageid":"","repeat":"","position":"","attachment":"","size":"","color":""},"custom_inner_background":{"image":"","imageid":"","repeat":"","position":"","attachment":"","size":"","color":""},"show_topbar":"","topbar_bg_color":"","topbar_bg_custom_color":"#dd3333","topbar_text_color":"","topbar_text_custom_color":"rgba(0, 0, 255, 0.25)","topbar_left_text":"","topbar_right_text":"","title":"","subtitle":"","titlebar_bg_custom_options":"custom","titlebar_bg_color":"darkgrey","titlebar_background":{"image":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/Ramal-Ferroviario-Sines-2-scaled.jpg","imageid":"16919","repeat":"no-repeat","position":"center top","attachment":"fixed","size":"cover","color":""},"titlebar_font_custom_options":"","titlebar_text_color":"white","titlebar_heading_font":{"family":"Arimo","backup-family":"Arial, Helvetica, sans-serif","variant":"regular","text-transform":"","font-size":"14","line-height":"16","letter-spacing":"0","color":"#202020","font":"google"},"titlebar_subheading_font":{"family":"Arimo","backup-family":"Arial, Helvetica, sans-serif","variant":"regular","text-transform":"","font-size":"14","line-height":"16","letter-spacing":"0","color":"#202020","font":"google"},"titlebar_breadcrumb_font":{"family":"Arimo","backup-family":"Arial, Helvetica, sans-serif","variant":"regular","text-transform":"","font-size":"14","line-height":"16","letter-spacing":"0","color":"#202020","font":"google"},"titlebar_view":"","titlebar_height":"","titlebar_hide_breadcrumb":"","skincolor":"","custom_background_switcher":false,"hide_titlebar":false},"_themetechmount_metabox_sidebar":{"sidebar":"","left_sidebar":"","right_sidebar":""},"themetechmount_page_row_settings":{"row_lower_padding":false},"themetechmount_portfolio_featured":{"featuredtype":"image","video_code":"","audio_code":"","slide_images":""},"themetechmount_portfolio_view":{"viewstyle":""},"themetechmount_portfolio_like":"","_wpb_vc_js_status":"false","_yoast_wpseo_primary_tm_portfolio_category":"","_yoast_wpseo_content_score":"30","_yoast_wpseo_estimated-reading-time-minutes":"3","_yoast_wpseo_wordproof_timestamp":"","themetechmount_likes":"0","_wpb_post_custom_layout":"default","_reuseb_geobox_preview":"{}","_yoast_wpseo_primary_projects":"","_yoast_wpseo_primary_skills":"","_yoast_wpseo_primary_countries":"","_wp_old_date":"2024-09-27"},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.7 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Rehabilitation of the Railway Branch of the Port of Sines - Teixeira Duarte Constru\u00e7\u00e3o<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/rehabilitation-of-the-railway-branch-of-the-port-of-sines\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Rehabilitation of the Railway Branch of the Port of Sines - Teixeira Duarte Constru\u00e7\u00e3o\" \/>\n<meta property=\"og:description\" content=\"REHABILITATION OF THE RAILWAY BRANCH OF THE PORT OF SINES Client: APS \u2013 Administra\u00e7\u00e3o dos Portos de Sines e do Algarve, S.A. Location: Terminal XXI \u2013 ZIL3 \u2013 TCS Terminal Contentores Sines \u2013 Portugal Execution Period: 9 Months &nbsp; The works carried out in the railway branch of the port of Sines was part of &hellip; Continue reading Rehabilitation of the Railway Branch of the Port of Sines\" \/>\n<meta property=\"og:url\" content=\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/rehabilitation-of-the-railway-branch-of-the-port-of-sines\/\" \/>\n<meta property=\"og:site_name\" content=\"Teixeira Duarte Constru\u00e7\u00e3o\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/teixeiraduarteconstrucao\/?locale=pt_PT\" \/>\n<meta property=\"og:image\" content=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/Ramal-Ferroviario-Sines-1-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1440\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/rehabilitation-of-the-railway-branch-of-the-port-of-sines\/\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/rehabilitation-of-the-railway-branch-of-the-port-of-sines\/\",\"name\":\"Rehabilitation of the Railway Branch of the Port of Sines - Teixeira Duarte Constru\u00e7\u00e3o\",\"isPartOf\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/rehabilitation-of-the-railway-branch-of-the-port-of-sines\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/rehabilitation-of-the-railway-branch-of-the-port-of-sines\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/Ramal-Ferroviario-Sines-1-scaled.jpg\",\"datePublished\":\"2024-09-30T07:54:59+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/rehabilitation-of-the-railway-branch-of-the-port-of-sines\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/rehabilitation-of-the-railway-branch-of-the-port-of-sines\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/rehabilitation-of-the-railway-branch-of-the-port-of-sines\/#primaryimage\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/Ramal-Ferroviario-Sines-1-scaled.jpg\",\"contentUrl\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/Ramal-Ferroviario-Sines-1-scaled.jpg\",\"width\":2560,\"height\":1440},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/rehabilitation-of-the-railway-branch-of-the-port-of-sines\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"In\u00edcio\",\"item\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Rehabilitation of the Railway Branch of the Port of Sines\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#website\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/\",\"name\":\"Teixeira Duarte Constru\u00e7\u00e3o\",\"description\":\"Pioneirismo e Inova\u00e7\u00e3o desde 1921\",\"publisher\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization\",\"name\":\"Teixeira Duarte - Engenharia e Constru\u00e7\u00f5es, S.A.\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2025\/04\/Logotipo-Teixeira-Duarte-EC-2024-positivo.png\",\"contentUrl\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2025\/04\/Logotipo-Teixeira-Duarte-EC-2024-positivo.png\",\"width\":3544,\"height\":1182,\"caption\":\"Teixeira Duarte - Engenharia e Constru\u00e7\u00f5es, S.A.\"},\"image\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/teixeiraduarteconstrucao\/?locale=pt_PT\",\"https:\/\/www.linkedin.com\/company\/teixeira-duarte-engenharia-e-construcoes\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Rehabilitation of the Railway Branch of the Port of Sines - Teixeira Duarte Constru\u00e7\u00e3o","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/rehabilitation-of-the-railway-branch-of-the-port-of-sines\/","og_locale":"en_US","og_type":"article","og_title":"Rehabilitation of the Railway Branch of the Port of Sines - Teixeira Duarte Constru\u00e7\u00e3o","og_description":"REHABILITATION OF THE RAILWAY BRANCH OF THE PORT OF SINES Client: APS \u2013 Administra\u00e7\u00e3o dos Portos de Sines e do Algarve, S.A. Location: Terminal XXI \u2013 ZIL3 \u2013 TCS Terminal Contentores Sines \u2013 Portugal Execution Period: 9 Months &nbsp; The works carried out in the railway branch of the port of Sines was part of &hellip; Continue reading Rehabilitation of the Railway Branch of the Port of Sines","og_url":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/rehabilitation-of-the-railway-branch-of-the-port-of-sines\/","og_site_name":"Teixeira Duarte Constru\u00e7\u00e3o","article_publisher":"https:\/\/www.facebook.com\/teixeiraduarteconstrucao\/?locale=pt_PT","og_image":[{"width":2560,"height":1440,"url":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/Ramal-Ferroviario-Sines-1-scaled.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/rehabilitation-of-the-railway-branch-of-the-port-of-sines\/","url":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/rehabilitation-of-the-railway-branch-of-the-port-of-sines\/","name":"Rehabilitation of the Railway Branch of the Port of Sines - Teixeira Duarte Constru\u00e7\u00e3o","isPartOf":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/rehabilitation-of-the-railway-branch-of-the-port-of-sines\/#primaryimage"},"image":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/rehabilitation-of-the-railway-branch-of-the-port-of-sines\/#primaryimage"},"thumbnailUrl":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/Ramal-Ferroviario-Sines-1-scaled.jpg","datePublished":"2024-09-30T07:54:59+00:00","breadcrumb":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/rehabilitation-of-the-railway-branch-of-the-port-of-sines\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/rehabilitation-of-the-railway-branch-of-the-port-of-sines\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/rehabilitation-of-the-railway-branch-of-the-port-of-sines\/#primaryimage","url":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/Ramal-Ferroviario-Sines-1-scaled.jpg","contentUrl":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/Ramal-Ferroviario-Sines-1-scaled.jpg","width":2560,"height":1440},{"@type":"BreadcrumbList","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/rehabilitation-of-the-railway-branch-of-the-port-of-sines\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"In\u00edcio","item":"https:\/\/teixeiraduarteconstrucao.com\/en\/"},{"@type":"ListItem","position":2,"name":"Rehabilitation of the Railway Branch of the Port of Sines"}]},{"@type":"WebSite","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#website","url":"https:\/\/teixeiraduarteconstrucao.com\/en\/","name":"Teixeira Duarte Constru\u00e7\u00e3o","description":"Pioneirismo e Inova\u00e7\u00e3o desde 1921","publisher":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/teixeiraduarteconstrucao.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization","name":"Teixeira Duarte - Engenharia e Constru\u00e7\u00f5es, S.A.","url":"https:\/\/teixeiraduarteconstrucao.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2025\/04\/Logotipo-Teixeira-Duarte-EC-2024-positivo.png","contentUrl":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2025\/04\/Logotipo-Teixeira-Duarte-EC-2024-positivo.png","width":3544,"height":1182,"caption":"Teixeira Duarte - Engenharia e Constru\u00e7\u00f5es, S.A."},"image":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/teixeiraduarteconstrucao\/?locale=pt_PT","https:\/\/www.linkedin.com\/company\/teixeira-duarte-engenharia-e-construcoes"]}]}},"_links":{"self":[{"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/tm_portfolio\/16924","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/tm_portfolio"}],"about":[{"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/types\/tm_portfolio"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/media\/16917"}],"wp:attachment":[{"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/media?parent=16924"}],"wp:term":[{"taxonomy":"projects","embeddable":true,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/projects?post=16924"},{"taxonomy":"skills","embeddable":true,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/skills?post=16924"},{"taxonomy":"countries","embeddable":true,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/countries?post=16924"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}