{"id":12462,"date":"2019-04-22T00:30:01","date_gmt":"2019-04-22T00:30:01","guid":{"rendered":"https:\/\/teixeiraduarteconstrucao.com\/projetos\/modernizacao-da-linha-ferroviaria-thenia-tizi-ouzou-e-a-sua-electrificacao-ate-oued-aissi\/"},"modified":"2019-08-21T15:58:00","modified_gmt":"2019-08-21T15:58:00","slug":"upgrading-works-on-thenia-tizi-ouzou-railway-line-and-its-electrification-up-to-oued-aissi-5014-km-naciria-boumerdes-algeria","status":"publish","type":"tm_portfolio","link":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/upgrading-works-on-thenia-tizi-ouzou-railway-line-and-its-electrification-up-to-oued-aissi-5014-km-naciria-boumerdes-algeria\/","title":{"rendered":"Upgrading Works On Thenia \/ Tizi-Ouzou Railway Line And Its Electrification Up To Oued Aissi (50+14 Km) &#8211; Naciria &#8211; Boumerdes &#8211; Algeria"},"content":{"rendered":"<h1><strong>UPGRADING WORKS ON THENIA \/ TIZI-OUZOU RAILWAY LINE <\/strong><strong>AND ITS ELECTRIFICATION UP TO OUED AISSI <\/strong><strong>(50+14 KM) &#8211; NACIRIA &#8211; BOUMERDES &#8211; ALGERIA<\/strong><\/h1>\n<p><strong>Owner<\/strong>: <span class=\"fontstyle0\">ANESRIF &#8211; Agence Nationale d\u2019Etudes et de Suivi de la R\u00e9alisations des Investissements Ferroviaires<\/span><br \/>\n<strong>Site<\/strong>: <span class=\"fontstyle0\">Th\u00e9nia (Boumerdes) \/ Tizi-Ouzou &#8211; Arg\u00e9lia<\/span><br \/>\n<strong>Conclusion year:<\/strong> 2017<\/p>\n<p>&nbsp;<\/p>\n<p>Execution of a new Railway Line layout between the towns Th\u00e9nia and Tizi-Ouzou (50 km) and electrification between Tizi-Ouzou and Oued Aissi (14 km).<\/p>\n<p>Project speed = 160 km\/h.<\/p>\n<p>&nbsp;<\/p>\n<p>Major works carried out within the work scope:<\/p>\n<p>Excavation\u00a0 \u00a02.222.355\u00a0\u00a0\u00a0 m<sup>3<\/sup><\/p>\n<p>Landfills\u00a0 2.037.286\u00a0\u00a0\u00a0 m<sup>3<\/sup><\/p>\n<p>Crest (crown) layer\u00a0 \u00a0190.304\u00a0\u00a0\u00a0 m<sup>3<\/sup><\/p>\n<p>Platform body\u00a0 133.188\u00a0\u00a0\u00a0 m<sup>3<\/sup><\/p>\n<p>Sub-ballast\u00a0 119.536\u00a0\u00a0\u00a0 m<sup>3<\/sup><\/p>\n<p>Railway viaducts (9 units)\u00a0 \u00a02.955\u00a0\u00a0\u00a0 ml<\/p>\n<p>Railway bridges (21 units)\u00a0 407\u00a0\u00a0\u00a0 ml<\/p>\n<p>Road bridges (10 units)\u00a0 \u00a0200\u00a0\u00a0\u00a0 ml<\/p>\n<p>Tunnels (4 units)\u00a0 \u00a02.947\u00a0\u00a0\u00a0 ml<\/p>\n<p>Concrete\u00a0 \u00a0144.193\u00a0\u00a0\u00a0 m<sup>3<\/sup><\/p>\n<p>Shot concrete\u00a0 \u00a0 141.675\u00a0\u00a0\u00a0 m<sup>2<\/sup><\/p>\n<p>A500NR steel\u00a0 \u00a010.677\u00a0\u00a0\u00a0 ton<\/p>\n<p>Pre-stressed steel\u00a0 \u00a0 260\u00a0\u00a0\u00a0 ton<\/p>\n<p>S355 Metalwork\u00a0 \u00a05.559\u00a0\u00a0\u00a0 ton<\/p>\n<p>Ties\u00a0 \u00a017.657\u00a0\u00a0\u00a0 units<\/p>\n<p>Piles\u00a0 \u00a0 19.908\u00a0\u00a0\u00a0 ml<\/p>\n<p>25\/60 Ballast\u00a0 \u00a0159.326\u00a0\u00a0\u00a0 m<sup>3<\/sup><\/p>\n<p>&nbsp;<\/p>\n<p>Supply and installation of track-switching equipment including manoeuvre engines: 35 units<\/p>\n<p>Supply of all materials and installation of 56 km of track equipment (UIC 60 rails)<\/p>\n<p>Supply and installation of 98.950 elastic fixing units<\/p>\n<p>Supply and installation of 95.000 <em>BIBLOCO<\/em> concrete sleepers units<\/p>\n<p>Supply and installation of 3.950 pre-stressed mono-block concrete sleepers units<\/p>\n<p>Supply of all materials and catenary installations in an extension of 95 km with 25 kV Voltage<\/p>\n<p>Production and supply of all equipment for 2 processing sub-stations of 63 kV \/ 25 kV<\/p>\n<p>Traffic control centre in Th\u00e9nia for the supervision of 9 interconnections and 50 km of railway line<\/p>\n<p>Electronic interlocking devices EIS23 (SIL-4) type: 9 units<\/p>\n<p>Automatic locking on a single track (B.A.U) and double track (B.A.D) with electronic technology between the stations<\/p>\n<p>Level crossings with automatic signalling (SIL-4): 7 units<\/p>\n<p>Supply and installation of signalling, disruption control systems, wiring and related civil works<\/p>\n<p>Optical fibre: 110 km<\/p>\n<p>Distribution nodes (15 SDH rings \u2013 synchronous digital hierarchy): 17 units<\/p>\n<p>Distribution nodes GSM-R: 8 units<\/p>\n<p>Telephone exchanges and Data Centres IP: 13 units<\/p>\n<p>Network administration centres: 23 units<\/p>\n<p>Technical installations: 10 units \/ Track lodgings: 8 units<\/p>\n<p>Railway stations: Th\u00e9nia, Si Mustapha, Les Issers, Bordj Menaiel, Naciria, Tademait, Draa Ben Khedda and Stoke Bay Boukhalfa<\/p>\n<div id='gallery-1' class='gallery galleryid-12462 gallery-columns-3 gallery-size-large'><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/mod-linha-ferrov-tiziouzu-01.jpg'><img decoding=\"async\" width=\"847\" height=\"565\" data-src=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/mod-linha-ferrov-tiziouzu-01-1024x683.jpg\" class=\"attachment-large size-large lazyload\" alt=\"\" data-srcset=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/mod-linha-ferrov-tiziouzu-01-1024x683.jpg 1024w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/mod-linha-ferrov-tiziouzu-01-300x200.jpg 300w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/mod-linha-ferrov-tiziouzu-01-768x512.jpg 768w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/mod-linha-ferrov-tiziouzu-01-1200x800.jpg 1200w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/mod-linha-ferrov-tiziouzu-01.jpg 1920w\" data-sizes=\"(max-width: 847px) 100vw, 847px\" data-id=\"12463\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 847px; --smush-placeholder-aspect-ratio: 847\/565;\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/mod-linha-ferrov-tiziouzu-09.jpg'><img decoding=\"async\" width=\"847\" height=\"565\" data-src=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/mod-linha-ferrov-tiziouzu-09-1024x683.jpg\" class=\"attachment-large size-large lazyload\" alt=\"\" data-srcset=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/mod-linha-ferrov-tiziouzu-09-1024x683.jpg 1024w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/mod-linha-ferrov-tiziouzu-09-300x200.jpg 300w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/mod-linha-ferrov-tiziouzu-09-768x512.jpg 768w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/mod-linha-ferrov-tiziouzu-09-1200x800.jpg 1200w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/mod-linha-ferrov-tiziouzu-09.jpg 1920w\" data-sizes=\"(max-width: 847px) 100vw, 847px\" data-id=\"12464\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 847px; --smush-placeholder-aspect-ratio: 847\/565;\" \/><\/a>\n\t\t\t<\/div><\/figure>\n\t\t<\/div>\n\n","protected":false},"featured_media":12464,"template":"","projects":[329,387],"skills":[331,337,396],"countries":[343,333],"class_list":["post-12462","tm_portfolio","type-tm_portfolio","status-publish","has-post-thumbnail","hentry","tm_portfolio_category-railway-infrastructures","projects-all","projects-railway-infrastructures","skills-all","skills-infrastructures","skills-railway-works","countries-algeria","countries-all"],"metadata":{"_wpml_media_has_media":"1","slide_template":"","_wpb_vc_js_status":"false","_themetechmount_metabox_group":{"slidertype":"","revslider":"tectxon-classic-slider","customslider":"","slider_width":"wide","custom_background":{"image":"","imageid":"","repeat":"","position":"","attachment":"","size":"","color":""},"custom_inner_background":{"image":"","imageid":"","repeat":"","position":"","attachment":"","size":"","color":""},"show_topbar":"","topbar_bg_color":"","topbar_bg_custom_color":"#dd3333","topbar_text_color":"","topbar_text_custom_color":"rgba(0, 0, 255, 0.25)","topbar_left_text":"","topbar_right_text":"","title":"","subtitle":"","titlebar_bg_custom_options":"custom","titlebar_bg_color":"darkgrey","titlebar_background":{"image":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/mod-linha-ferrov-tiziouzu-12.jpg","imageid":"6080","repeat":"no-repeat","position":"center center","attachment":"fixed","size":"cover","color":""},"titlebar_font_custom_options":"","titlebar_text_color":"white","titlebar_heading_font":{"family":"Arimo","backup-family":"Arial, Helvetica, sans-serif","variant":"regular","text-transform":"","font-size":"14","line-height":"16","letter-spacing":"0","color":"#202020","font":"google"},"titlebar_subheading_font":{"family":"Arimo","backup-family":"Arial, Helvetica, sans-serif","variant":"regular","text-transform":"","font-size":"14","line-height":"16","letter-spacing":"0","color":"#202020","font":"google"},"titlebar_breadcrumb_font":{"family":"Arimo","backup-family":"Arial, Helvetica, sans-serif","variant":"regular","text-transform":"","font-size":"14","line-height":"16","letter-spacing":"0","color":"#202020","font":"google"},"titlebar_view":"allleft","titlebar_height":"","titlebar_hide_breadcrumb":"","skincolor":"","custom_background_switcher":false,"hide_titlebar":false},"_themetechmount_metabox_sidebar":{"sidebar":"no","left_sidebar":"","right_sidebar":""},"themetechmount_page_row_settings":{"row_lower_padding":false},"themetechmount_portfolio_list_data":{"tm_pf_list_data":{"pf_details_line_0":"Moderniza\u00e7\u00e3o da Linha Ferrovi\u00e1ria Thenia\/Tizi-Ouzou e a sua Electrifica\u00e7\u00e3o at\u00e9 Oued Aissi","pf_details_line_1":"ANESRIF - Agence Nationale d\u2019Etudes et de Suivi de la R\u00e9alisations des Investissements Ferroviaire","pf_details_line_2":"Infraestruturas Ferrovi\u00e1rias","pf_details_line_3":"Th\u00e9nia (Boumerdes) \/ Tizi-Ouzou - Arg\u00e9lia","pf_details_line_4":"2017"}},"themetechmount_portfolio_featured":{"featuredtype":"image","video_code":"","audio_code":"","slide_images":""},"themetechmount_portfolio_view":{"viewstyle":"full-withimg"},"themetechmount_portfolio_like":"","themetechmount_likes":"0","_yoast_wpseo_content_score":"30","_yoast_wpseo_primary_tm_portfolio_category":"","_wp_old_date":"2019-04-17","_thumbnail_id":"12464","_edit_lock":"1566403080:2","_edit_last":"2","_wp_old_slug":"modernizacao-da-linha-ferroviaria-thenia-tizi-ouzou-e-a-sua-electrificacao-ate-oued-aissi","_reuseb_geobox_preview":"{}","_yoast_wpseo_primary_projects":"","_yoast_wpseo_primary_skills":"","_yoast_wpseo_primary_countries":"","_last_translation_edit_mode":"translation-editor","_wpml_media_duplicate":"0","_wpml_media_featured":"0"},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.7 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Upgrading Works On Thenia \/ Tizi-Ouzou Railway Line And Its Electrification Up To Oued Aissi (50+14 Km) - Naciria - Boumerdes - Algeria - Teixeira Duarte Constru\u00e7\u00e3o<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/upgrading-works-on-thenia-tizi-ouzou-railway-line-and-its-electrification-up-to-oued-aissi-5014-km-naciria-boumerdes-algeria\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Upgrading Works On Thenia \/ Tizi-Ouzou Railway Line And Its Electrification Up To Oued Aissi (50+14 Km) - Naciria - Boumerdes - Algeria - Teixeira Duarte Constru\u00e7\u00e3o\" \/>\n<meta property=\"og:description\" content=\"UPGRADING WORKS ON THENIA \/ TIZI-OUZOU RAILWAY LINE AND ITS ELECTRIFICATION UP TO OUED AISSI (50+14 KM) &#8211; NACIRIA &#8211; BOUMERDES &#8211; ALGERIA Owner: ANESRIF &#8211; Agence Nationale d\u2019Etudes et de Suivi de la R\u00e9alisations des Investissements Ferroviaires Site: Th\u00e9nia (Boumerdes) \/ Tizi-Ouzou &#8211; Arg\u00e9lia Conclusion year: 2017 &nbsp; Execution of a new Railway Line &hellip; Continue reading Upgrading Works On Thenia \/ Tizi-Ouzou Railway Line And Its Electrification Up To Oued Aissi (50+14 Km) &#8211; Naciria &#8211; Boumerdes &#8211; Algeria\" \/>\n<meta property=\"og:url\" content=\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/upgrading-works-on-thenia-tizi-ouzou-railway-line-and-its-electrification-up-to-oued-aissi-5014-km-naciria-boumerdes-algeria\/\" \/>\n<meta property=\"og:site_name\" content=\"Teixeira Duarte Constru\u00e7\u00e3o\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/teixeiraduarteconstrucao\/?locale=pt_PT\" \/>\n<meta property=\"article:modified_time\" content=\"2019-08-21T15:58:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/mod-linha-ferrov-tiziouzu-09.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1280\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/upgrading-works-on-thenia-tizi-ouzou-railway-line-and-its-electrification-up-to-oued-aissi-5014-km-naciria-boumerdes-algeria\/\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/upgrading-works-on-thenia-tizi-ouzou-railway-line-and-its-electrification-up-to-oued-aissi-5014-km-naciria-boumerdes-algeria\/\",\"name\":\"Upgrading Works On Thenia \/ Tizi-Ouzou Railway Line And Its Electrification Up To Oued Aissi (50+14 Km) - Naciria - Boumerdes - Algeria - Teixeira Duarte Constru\u00e7\u00e3o\",\"isPartOf\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/upgrading-works-on-thenia-tizi-ouzou-railway-line-and-its-electrification-up-to-oued-aissi-5014-km-naciria-boumerdes-algeria\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/upgrading-works-on-thenia-tizi-ouzou-railway-line-and-its-electrification-up-to-oued-aissi-5014-km-naciria-boumerdes-algeria\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/mod-linha-ferrov-tiziouzu-09.jpg\",\"datePublished\":\"2019-04-22T00:30:01+00:00\",\"dateModified\":\"2019-08-21T15:58:00+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/upgrading-works-on-thenia-tizi-ouzou-railway-line-and-its-electrification-up-to-oued-aissi-5014-km-naciria-boumerdes-algeria\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/upgrading-works-on-thenia-tizi-ouzou-railway-line-and-its-electrification-up-to-oued-aissi-5014-km-naciria-boumerdes-algeria\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/upgrading-works-on-thenia-tizi-ouzou-railway-line-and-its-electrification-up-to-oued-aissi-5014-km-naciria-boumerdes-algeria\/#primaryimage\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/mod-linha-ferrov-tiziouzu-09.jpg\",\"contentUrl\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/mod-linha-ferrov-tiziouzu-09.jpg\",\"width\":1920,\"height\":1280},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/upgrading-works-on-thenia-tizi-ouzou-railway-line-and-its-electrification-up-to-oued-aissi-5014-km-naciria-boumerdes-algeria\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"In\u00edcio\",\"item\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Upgrading Works On Thenia \/ Tizi-Ouzou Railway Line And Its Electrification Up To Oued Aissi (50+14 Km) &#8211; Naciria &#8211; Boumerdes &#8211; Algeria\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#website\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/\",\"name\":\"Teixeira Duarte Constru\u00e7\u00e3o\",\"description\":\"Pioneirismo e Inova\u00e7\u00e3o desde 1921\",\"publisher\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization\",\"name\":\"Teixeira Duarte - Engenharia e Constru\u00e7\u00f5es, S.A.\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2025\/04\/Logotipo-Teixeira-Duarte-EC-2024-positivo.png\",\"contentUrl\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2025\/04\/Logotipo-Teixeira-Duarte-EC-2024-positivo.png\",\"width\":3544,\"height\":1182,\"caption\":\"Teixeira Duarte - Engenharia e Constru\u00e7\u00f5es, S.A.\"},\"image\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/teixeiraduarteconstrucao\/?locale=pt_PT\",\"https:\/\/www.linkedin.com\/company\/teixeira-duarte-engenharia-e-construcoes\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Upgrading Works On Thenia \/ Tizi-Ouzou Railway Line And Its Electrification Up To Oued Aissi (50+14 Km) - Naciria - Boumerdes - Algeria - Teixeira Duarte Constru\u00e7\u00e3o","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/upgrading-works-on-thenia-tizi-ouzou-railway-line-and-its-electrification-up-to-oued-aissi-5014-km-naciria-boumerdes-algeria\/","og_locale":"en_US","og_type":"article","og_title":"Upgrading Works On Thenia \/ Tizi-Ouzou Railway Line And Its Electrification Up To Oued Aissi (50+14 Km) - Naciria - Boumerdes - Algeria - Teixeira Duarte Constru\u00e7\u00e3o","og_description":"UPGRADING WORKS ON THENIA \/ TIZI-OUZOU RAILWAY LINE AND ITS ELECTRIFICATION UP TO OUED AISSI (50+14 KM) &#8211; NACIRIA &#8211; BOUMERDES &#8211; ALGERIA Owner: ANESRIF &#8211; Agence Nationale d\u2019Etudes et de Suivi de la R\u00e9alisations des Investissements Ferroviaires Site: Th\u00e9nia (Boumerdes) \/ Tizi-Ouzou &#8211; Arg\u00e9lia Conclusion year: 2017 &nbsp; Execution of a new Railway Line &hellip; Continue reading Upgrading Works On Thenia \/ Tizi-Ouzou Railway Line And Its Electrification Up To Oued Aissi (50+14 Km) &#8211; Naciria &#8211; Boumerdes &#8211; Algeria","og_url":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/upgrading-works-on-thenia-tizi-ouzou-railway-line-and-its-electrification-up-to-oued-aissi-5014-km-naciria-boumerdes-algeria\/","og_site_name":"Teixeira Duarte Constru\u00e7\u00e3o","article_publisher":"https:\/\/www.facebook.com\/teixeiraduarteconstrucao\/?locale=pt_PT","article_modified_time":"2019-08-21T15:58:00+00:00","og_image":[{"width":1920,"height":1280,"url":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/mod-linha-ferrov-tiziouzu-09.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/upgrading-works-on-thenia-tizi-ouzou-railway-line-and-its-electrification-up-to-oued-aissi-5014-km-naciria-boumerdes-algeria\/","url":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/upgrading-works-on-thenia-tizi-ouzou-railway-line-and-its-electrification-up-to-oued-aissi-5014-km-naciria-boumerdes-algeria\/","name":"Upgrading Works On Thenia \/ Tizi-Ouzou Railway Line And Its Electrification Up To Oued Aissi (50+14 Km) - Naciria - Boumerdes - Algeria - Teixeira Duarte Constru\u00e7\u00e3o","isPartOf":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/upgrading-works-on-thenia-tizi-ouzou-railway-line-and-its-electrification-up-to-oued-aissi-5014-km-naciria-boumerdes-algeria\/#primaryimage"},"image":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/upgrading-works-on-thenia-tizi-ouzou-railway-line-and-its-electrification-up-to-oued-aissi-5014-km-naciria-boumerdes-algeria\/#primaryimage"},"thumbnailUrl":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/mod-linha-ferrov-tiziouzu-09.jpg","datePublished":"2019-04-22T00:30:01+00:00","dateModified":"2019-08-21T15:58:00+00:00","breadcrumb":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/upgrading-works-on-thenia-tizi-ouzou-railway-line-and-its-electrification-up-to-oued-aissi-5014-km-naciria-boumerdes-algeria\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/upgrading-works-on-thenia-tizi-ouzou-railway-line-and-its-electrification-up-to-oued-aissi-5014-km-naciria-boumerdes-algeria\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/upgrading-works-on-thenia-tizi-ouzou-railway-line-and-its-electrification-up-to-oued-aissi-5014-km-naciria-boumerdes-algeria\/#primaryimage","url":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/mod-linha-ferrov-tiziouzu-09.jpg","contentUrl":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/mod-linha-ferrov-tiziouzu-09.jpg","width":1920,"height":1280},{"@type":"BreadcrumbList","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/upgrading-works-on-thenia-tizi-ouzou-railway-line-and-its-electrification-up-to-oued-aissi-5014-km-naciria-boumerdes-algeria\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"In\u00edcio","item":"https:\/\/teixeiraduarteconstrucao.com\/en\/"},{"@type":"ListItem","position":2,"name":"Upgrading Works On Thenia \/ Tizi-Ouzou Railway Line And Its Electrification Up To Oued Aissi (50+14 Km) &#8211; Naciria &#8211; Boumerdes &#8211; Algeria"}]},{"@type":"WebSite","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#website","url":"https:\/\/teixeiraduarteconstrucao.com\/en\/","name":"Teixeira Duarte Constru\u00e7\u00e3o","description":"Pioneirismo e Inova\u00e7\u00e3o desde 1921","publisher":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/teixeiraduarteconstrucao.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization","name":"Teixeira Duarte - Engenharia e Constru\u00e7\u00f5es, S.A.","url":"https:\/\/teixeiraduarteconstrucao.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2025\/04\/Logotipo-Teixeira-Duarte-EC-2024-positivo.png","contentUrl":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2025\/04\/Logotipo-Teixeira-Duarte-EC-2024-positivo.png","width":3544,"height":1182,"caption":"Teixeira Duarte - Engenharia e Constru\u00e7\u00f5es, S.A."},"image":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/teixeiraduarteconstrucao\/?locale=pt_PT","https:\/\/www.linkedin.com\/company\/teixeira-duarte-engenharia-e-construcoes"]}]}},"_links":{"self":[{"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/tm_portfolio\/12462","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/tm_portfolio"}],"about":[{"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/types\/tm_portfolio"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/media\/12464"}],"wp:attachment":[{"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/media?parent=12462"}],"wp:term":[{"taxonomy":"projects","embeddable":true,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/projects?post=12462"},{"taxonomy":"skills","embeddable":true,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/skills?post=12462"},{"taxonomy":"countries","embeddable":true,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/countries?post=12462"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}