{"id":12218,"date":"2019-04-18T17:21:47","date_gmt":"2019-04-18T17:21:47","guid":{"rendered":"https:\/\/teixeiraduarteconstrucao.com\/projetos\/projeto-e-construcao-da-ampliacao-e-modernizacao-do-porto-de-la-guaira-sector-oeste\/"},"modified":"2019-08-05T09:30:57","modified_gmt":"2019-08-05T09:30:57","slug":"expansion-and-modernisation-of-the-la-guaira-port","status":"publish","type":"tm_portfolio","link":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/expansion-and-modernisation-of-the-la-guaira-port\/","title":{"rendered":"Expansion and modernisation of the La Guaira Port"},"content":{"rendered":"<h1>EXPANSION AND MODERNISATION OF THE LA GUAIRA PORT &#8211; VENEZUELA<\/h1>\n<p><strong>Client<\/strong>: <span class=\"fontstyle0\">Puertos del Alba, S.A.<\/span><br \/>\n<strong>Location<\/strong>: <span class=\"fontstyle0\">Puerto de la Guaira &#8211; Estado Vargas &#8211; Venezuela<\/span><br \/>\n<strong>Conclusion Year<\/strong>: 2015<\/p>\n<p>&nbsp;<\/p>\n<p>This project included the execution of marine works for the expansion and modernisation of an existing port. These involved the construction of a new container terminal (West Pier), in reinforced concrete with extension of 690 metres for the docking of \u201cPost-Panamax\u201d ships, built on 1200 mm diameter and 32.0 m depth piles and underwater depth of -15.20 m.<\/p>\n<p>Construction of a containers storage yard, with all the infrastructures and paving with cobblestones, with a building area of 154 900 m2.<br \/>\nConstruction of office building, gatehouses, social buildings, transforming power station building with the total area of 1 900 m2.<br \/>\nConstruction of central workshop for port management equipment maintenance with an area of 3,900 m2 and an area of 50 000 m2 for truck parking.<br \/>\nThey area also included the execution of electrical installations, water supply, safety systems and firefighting system.<br \/>\nThe contract job included the supply and installation of the port management equipment required to operate the new terminal.<\/p>\n<p><strong>Relevant data:<\/strong><\/p>\n<p>Total dredging volume: 950 000 m3<br \/>\nBreakwater volume TOT: 310 000 m3<br \/>\nVolume of protection with rock filling: 55 000 m3<br \/>\nVolume of landfill: 850 000 m3<br \/>\nDemolitions: 50 000 m3<br \/>\n1200 mm diameter piles (465 un): 14 000 ml<br \/>\nStructural concrete: 40 095 m3<br \/>\nStructural steel: 5 000 000 kg<br \/>\nElectrical infrastructures and draining: 11 900 ml<\/p>\n<p>Total construction area: 175 000 m2<br \/>\nTotal area taken from the sea: 106 000 m2<br \/>\nContainers storage yard: 154 900 m2<br \/>\nTruck parking: 50 000 m2<br \/>\nPort operation support facilities: 5 800 m2<\/p>\n<p><strong>Supply and installation of port equipment:<\/strong><\/p>\n<p>6 Ship to Shore (STS) cranes<br \/>\n15 RTG Cranes<br \/>\n2 Reach Stackers<br \/>\n6 empty front-end stacking trucks (9 ton)<br \/>\n32 Terminal tractors<br \/>\n40 Terminal platforms<\/p>\n<p>&nbsp;<\/p>\n<div id='gallery-1' class='gallery galleryid-12218 gallery-columns-3 gallery-size-large'><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/porto-la-guaira-06.jpg'><img decoding=\"async\" width=\"847\" height=\"567\" data-src=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/porto-la-guaira-06-1024x685.jpg\" class=\"attachment-large size-large lazyload\" alt=\"\" data-srcset=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/porto-la-guaira-06-1024x685.jpg 1024w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/porto-la-guaira-06-300x201.jpg 300w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/porto-la-guaira-06-768x514.jpg 768w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/porto-la-guaira-06.jpg 1920w\" data-sizes=\"(max-width: 847px) 100vw, 847px\" data-id=\"12219\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 847px; --smush-placeholder-aspect-ratio: 847\/567;\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/porto-la-guaira-35.jpg'><img decoding=\"async\" width=\"847\" height=\"561\" data-src=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/porto-la-guaira-35-1024x678.jpg\" class=\"attachment-large size-large lazyload\" alt=\"\" data-srcset=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/porto-la-guaira-35-1024x678.jpg 1024w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/porto-la-guaira-35-300x199.jpg 300w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/porto-la-guaira-35-768x509.jpg 768w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/porto-la-guaira-35.jpg 1920w\" data-sizes=\"(max-width: 847px) 100vw, 847px\" data-id=\"12220\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 847px; --smush-placeholder-aspect-ratio: 847\/561;\" \/><\/a>\n\t\t\t<\/div><\/figure>\n\t\t<\/div>\n\n","protected":false},"featured_media":12220,"template":"","projects":[329,388],"skills":[331,392,397],"countries":[333,411],"class_list":["post-12218","tm_portfolio","type-tm_portfolio","status-publish","has-post-thumbnail","hentry","tm_portfolio_category-highlighted","tm_portfolio_category-marine-and-river-infrastructures","projects-all","projects-marine-and-river-infrastructures","skills-all","skills-epc-engineering-procurement-construction-en","skills-marine-works","countries-all","countries-venezuela-en"],"metadata":{"_wpml_media_has_media":"1","slide_template":"default","_wpb_vc_js_status":"false","_themetechmount_metabox_group":{"slidertype":"","revslider":"tectxon-classic-slider","customslider":"","slider_width":"wide","custom_background":{"image":"","imageid":"","repeat":"","position":"","attachment":"","size":"","color":""},"custom_inner_background":{"image":"","imageid":"","repeat":"","position":"","attachment":"","size":"","color":""},"show_topbar":"","topbar_bg_color":"","topbar_bg_custom_color":"#dd3333","topbar_text_color":"","topbar_text_custom_color":"rgba(0, 0, 255, 0.25)","topbar_left_text":"","topbar_right_text":"","title":"","subtitle":"","titlebar_bg_custom_options":"custom","titlebar_bg_color":"darkgrey","titlebar_background":{"image":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/porto-la-guaira-32.jpg","imageid":"5471","repeat":"no-repeat","position":"center bottom","attachment":"fixed","size":"cover","color":""},"titlebar_font_custom_options":"","titlebar_text_color":"white","titlebar_heading_font":{"family":"Arimo","backup-family":"Arial, Helvetica, sans-serif","variant":"regular","text-transform":"","font-size":"14","line-height":"16","letter-spacing":"0","color":"#202020","font":"google"},"titlebar_subheading_font":{"family":"Arimo","backup-family":"Arial, Helvetica, sans-serif","variant":"regular","text-transform":"","font-size":"14","line-height":"16","letter-spacing":"0","color":"#202020","font":"google"},"titlebar_breadcrumb_font":{"family":"Arimo","backup-family":"Arial, Helvetica, sans-serif","variant":"regular","text-transform":"","font-size":"14","line-height":"16","letter-spacing":"0","color":"#202020","font":"google"},"titlebar_view":"allleft","titlebar_height":"","titlebar_hide_breadcrumb":"","skincolor":"","custom_background_switcher":false,"hide_titlebar":false},"_themetechmount_metabox_sidebar":{"sidebar":"no","left_sidebar":"","right_sidebar":""},"themetechmount_page_row_settings":{"row_lower_padding":false},"themetechmount_portfolio_list_data":{"tm_pf_list_data":{"pf_details_line_0":"EPC para a Moderniza\u00e7\u00e3o do Porto de La Guaira - Setor Oeste","pf_details_line_1":"Puertos del Alba, S.A.","pf_details_line_2":"Obras Mar\u00edtimas","pf_details_line_3":"Caracas - Venezuela","pf_details_line_4":"2015"}},"themetechmount_portfolio_featured":{"featuredtype":"image","video_code":"","audio_code":"","slide_images":""},"themetechmount_portfolio_view":{"viewstyle":"full-withimg"},"themetechmount_portfolio_like":"","themetechmount_likes":"0","_yoast_wpseo_content_score":"60","_yoast_wpseo_primary_tm_portfolio_category":"","_reuseb_geobox_preview":"{}","_yoast_wpseo_primary_skills_br":"210","_yoast_wpseo_primary_projectos_br":"","_yoast_wpseo_primary_projects":"","_yoast_wpseo_primary_skills":"","_yoast_wpseo_primary_countries":"","_wpml_location_migration_done":"1","_thumbnail_id":"12220","_edit_lock":"1564997332:2","_edit_last":"2","_last_translation_edit_mode":"native-editor","_wp_old_slug":"projeto-e-construcao-da-ampliacao-e-modernizacao-do-porto-de-la-guaira-sector-oeste","_wpml_media_duplicate":"0","_wpml_media_featured":"0"},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.7 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Expansion and modernisation of the La Guaira Port - Teixeira Duarte Constru\u00e7\u00e3o<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/expansion-and-modernisation-of-the-la-guaira-port\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Expansion and modernisation of the La Guaira Port - Teixeira Duarte Constru\u00e7\u00e3o\" \/>\n<meta property=\"og:description\" content=\"EXPANSION AND MODERNISATION OF THE LA GUAIRA PORT &#8211; VENEZUELA Client: Puertos del Alba, S.A. Location: Puerto de la Guaira &#8211; Estado Vargas &#8211; Venezuela Conclusion Year: 2015 &nbsp; This project included the execution of marine works for the expansion and modernisation of an existing port. These involved the construction of a new container terminal &hellip; Continue reading Expansion and modernisation of the La Guaira Port\" \/>\n<meta property=\"og:url\" content=\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/expansion-and-modernisation-of-the-la-guaira-port\/\" \/>\n<meta property=\"og:site_name\" content=\"Teixeira Duarte Constru\u00e7\u00e3o\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/teixeiraduarteconstrucao\/?locale=pt_PT\" \/>\n<meta property=\"article:modified_time\" content=\"2019-08-05T09:30:57+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/porto-la-guaira-35.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1272\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/expansion-and-modernisation-of-the-la-guaira-port\/\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/expansion-and-modernisation-of-the-la-guaira-port\/\",\"name\":\"Expansion and modernisation of the La Guaira Port - Teixeira Duarte Constru\u00e7\u00e3o\",\"isPartOf\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/expansion-and-modernisation-of-the-la-guaira-port\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/expansion-and-modernisation-of-the-la-guaira-port\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/porto-la-guaira-35.jpg\",\"datePublished\":\"2019-04-18T17:21:47+00:00\",\"dateModified\":\"2019-08-05T09:30:57+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/expansion-and-modernisation-of-the-la-guaira-port\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/expansion-and-modernisation-of-the-la-guaira-port\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/expansion-and-modernisation-of-the-la-guaira-port\/#primaryimage\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/porto-la-guaira-35.jpg\",\"contentUrl\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/porto-la-guaira-35.jpg\",\"width\":1920,\"height\":1272},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/expansion-and-modernisation-of-the-la-guaira-port\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"In\u00edcio\",\"item\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Expansion and modernisation of the La Guaira Port\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#website\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/\",\"name\":\"Teixeira Duarte Constru\u00e7\u00e3o\",\"description\":\"Pioneirismo e Inova\u00e7\u00e3o desde 1921\",\"publisher\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization\",\"name\":\"Teixeira Duarte - Engenharia e Constru\u00e7\u00f5es, S.A.\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2025\/04\/Logotipo-Teixeira-Duarte-EC-2024-positivo.png\",\"contentUrl\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2025\/04\/Logotipo-Teixeira-Duarte-EC-2024-positivo.png\",\"width\":3544,\"height\":1182,\"caption\":\"Teixeira Duarte - Engenharia e Constru\u00e7\u00f5es, S.A.\"},\"image\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/teixeiraduarteconstrucao\/?locale=pt_PT\",\"https:\/\/www.linkedin.com\/company\/teixeira-duarte-engenharia-e-construcoes\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Expansion and modernisation of the La Guaira Port - Teixeira Duarte Constru\u00e7\u00e3o","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/expansion-and-modernisation-of-the-la-guaira-port\/","og_locale":"en_US","og_type":"article","og_title":"Expansion and modernisation of the La Guaira Port - Teixeira Duarte Constru\u00e7\u00e3o","og_description":"EXPANSION AND MODERNISATION OF THE LA GUAIRA PORT &#8211; VENEZUELA Client: Puertos del Alba, S.A. Location: Puerto de la Guaira &#8211; Estado Vargas &#8211; Venezuela Conclusion Year: 2015 &nbsp; This project included the execution of marine works for the expansion and modernisation of an existing port. These involved the construction of a new container terminal &hellip; Continue reading Expansion and modernisation of the La Guaira Port","og_url":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/expansion-and-modernisation-of-the-la-guaira-port\/","og_site_name":"Teixeira Duarte Constru\u00e7\u00e3o","article_publisher":"https:\/\/www.facebook.com\/teixeiraduarteconstrucao\/?locale=pt_PT","article_modified_time":"2019-08-05T09:30:57+00:00","og_image":[{"width":1920,"height":1272,"url":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/porto-la-guaira-35.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/expansion-and-modernisation-of-the-la-guaira-port\/","url":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/expansion-and-modernisation-of-the-la-guaira-port\/","name":"Expansion and modernisation of the La Guaira Port - Teixeira Duarte Constru\u00e7\u00e3o","isPartOf":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/expansion-and-modernisation-of-the-la-guaira-port\/#primaryimage"},"image":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/expansion-and-modernisation-of-the-la-guaira-port\/#primaryimage"},"thumbnailUrl":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/porto-la-guaira-35.jpg","datePublished":"2019-04-18T17:21:47+00:00","dateModified":"2019-08-05T09:30:57+00:00","breadcrumb":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/expansion-and-modernisation-of-the-la-guaira-port\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/expansion-and-modernisation-of-the-la-guaira-port\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/expansion-and-modernisation-of-the-la-guaira-port\/#primaryimage","url":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/porto-la-guaira-35.jpg","contentUrl":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/porto-la-guaira-35.jpg","width":1920,"height":1272},{"@type":"BreadcrumbList","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/expansion-and-modernisation-of-the-la-guaira-port\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"In\u00edcio","item":"https:\/\/teixeiraduarteconstrucao.com\/en\/"},{"@type":"ListItem","position":2,"name":"Expansion and modernisation of the La Guaira Port"}]},{"@type":"WebSite","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#website","url":"https:\/\/teixeiraduarteconstrucao.com\/en\/","name":"Teixeira Duarte Constru\u00e7\u00e3o","description":"Pioneirismo e Inova\u00e7\u00e3o desde 1921","publisher":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/teixeiraduarteconstrucao.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization","name":"Teixeira Duarte - Engenharia e Constru\u00e7\u00f5es, S.A.","url":"https:\/\/teixeiraduarteconstrucao.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2025\/04\/Logotipo-Teixeira-Duarte-EC-2024-positivo.png","contentUrl":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2025\/04\/Logotipo-Teixeira-Duarte-EC-2024-positivo.png","width":3544,"height":1182,"caption":"Teixeira Duarte - Engenharia e Constru\u00e7\u00f5es, S.A."},"image":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/teixeiraduarteconstrucao\/?locale=pt_PT","https:\/\/www.linkedin.com\/company\/teixeira-duarte-engenharia-e-construcoes"]}]}},"_links":{"self":[{"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/tm_portfolio\/12218","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/tm_portfolio"}],"about":[{"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/types\/tm_portfolio"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/media\/12220"}],"wp:attachment":[{"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/media?parent=12218"}],"wp:term":[{"taxonomy":"projects","embeddable":true,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/projects?post=12218"},{"taxonomy":"skills","embeddable":true,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/skills?post=12218"},{"taxonomy":"countries","embeddable":true,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/countries?post=12218"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}