{"id":12157,"date":"2019-04-21T23:46:09","date_gmt":"2019-04-21T23:46:09","guid":{"rendered":"https:\/\/teixeiraduarteconstrucao.com\/projetos\/interceptor-cais-do-sodre-alcantara-ii\/"},"modified":"2019-08-05T08:32:15","modified_gmt":"2019-08-05T08:32:15","slug":"sewers-catch-system-at-the-cais-do-sodre-alcantara-ii","status":"publish","type":"tm_portfolio","link":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/sewers-catch-system-at-the-cais-do-sodre-alcantara-ii\/","title":{"rendered":"Sewers Catch System At The Cais Do Sodr\u00e9\/Alc\u00e2ntara II"},"content":{"rendered":"<h1>SEWERS CATCH SYSTEM AT THE CAIS DO SODR\u00c9\/ALC\u00c2NTARA II<\/h1>\n<p><strong>Client<\/strong>: <span class=\"fontstyle0\">SIMTEJO &#8211; Saneamento Integrado dos Munic\u00edpios do Tejo e do Tranc\u00e3o, S.A.<\/span><br \/>\n<strong>Location<\/strong>: <span class=\"fontstyle0\">Lisbon (between Cais do Sodr\u00e9 and Santos) &#8211; Portugal<\/span><br \/>\n<b>Conclusion Year: <\/b>2010<\/p>\n<p>&nbsp;<\/p>\n<p>The purpose of this contract job is to build the domestic effluents transport and catch infrastructures to be treated at the Alc\u00e2ntara WWTP, the draining fronts, Largo Chafariz de Dentro \u2013 Terreiro do Pa\u00e7o \u2013 Cais do Sodr\u00e9, which are presently being directly discharged to the Tagus River estuary, with the highlight in the following works:<\/p>\n<ul>\n<li>Gravity catch system along Rua da Cintura do Porto de Lisboa and Avenida de Bras\u00edlia, in ductile cast iron piping, DN 1200 mm, with a slope of approximately 1.0 per thousand, in a total extension of 2 059 m;<\/li>\n<li>EE20 Santos and EE19 Rocha Conde de \u00d3bidos Pumping Stations (Flow = 1.100 litres\/second);<\/li>\n<li>DN 1000 mm and DN 900 mm eduction pipe, in ductile cast iron, in an approximate length of 450 m (386 m in DN 1000 mm and 63 m in DN 900 mm), downstream the EE19 Rocha Conde de \u00d3bidos Pumping Station;<\/li>\n<li>Crossing between the riverside area of Alc\u00e2ntara and 24 de Julho, carried out using the horizontal drilling method, with the driving of DN 1500 concrete piping, in an extension of approximately 60 m;<\/li>\n<li>Infrastructures by-pass, suspension and replacement to the original position (affected services);<\/li>\n<li>Works and surrounding area monitoring;<\/li>\n<li>Detour of road and pedestrians traffic.<\/li>\n<\/ul>\n<p><strong>Relevant data:<\/strong><\/p>\n<p>Excavations: 25 186 m3<br \/>\nTransport of the excavated material to an authorized depot: 25 186 m3<br \/>\nSheet-Piles: 27 810 m2<br \/>\nHorizontal Drilling: 60 m<br \/>\nGravity catch system Ductile Iron DN 1200 mm: 2 059 m<br \/>\nPiping in Ductile cast Iron DN 1000 mm, in the eduction pipe: 386 m<br \/>\nPiping in Ductile cast Iron DN 900 mm, in the pumping station: 63 m<br \/>\nDN 600 mm piles, in C3545.XA3 reinforced concrete: 3 786 m<\/p>\n<p>&nbsp;<\/p>\n<div id='gallery-1' class='gallery galleryid-12157 gallery-columns-2 gallery-size-large'><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-01.jpg'><img decoding=\"async\" width=\"847\" height=\"565\" data-src=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-01-1024x683.jpg\" class=\"attachment-large size-large lazyload\" alt=\"\" data-srcset=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-01-1024x683.jpg 1024w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-01-300x200.jpg 300w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-01-768x512.jpg 768w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-01-1200x800.jpg 1200w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-01.jpg 1920w\" data-sizes=\"(max-width: 847px) 100vw, 847px\" data-id=\"12158\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 847px; --smush-placeholder-aspect-ratio: 847\/565;\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-02.jpg'><img decoding=\"async\" width=\"847\" height=\"565\" data-src=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-02-1024x683.jpg\" class=\"attachment-large size-large lazyload\" alt=\"\" data-srcset=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-02-1024x683.jpg 1024w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-02-300x200.jpg 300w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-02-768x512.jpg 768w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-02-1200x800.jpg 1200w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-02.jpg 1920w\" data-sizes=\"(max-width: 847px) 100vw, 847px\" data-id=\"12161\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 847px; --smush-placeholder-aspect-ratio: 847\/565;\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-04.jpg'><img decoding=\"async\" width=\"847\" height=\"565\" data-src=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-04-1024x683.jpg\" class=\"attachment-large size-large lazyload\" alt=\"\" data-srcset=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-04-1024x683.jpg 1024w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-04-300x200.jpg 300w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-04-768x512.jpg 768w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-04-1200x800.jpg 1200w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-04.jpg 1920w\" data-sizes=\"(max-width: 847px) 100vw, 847px\" data-id=\"12162\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 847px; --smush-placeholder-aspect-ratio: 847\/565;\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-05.jpg'><img decoding=\"async\" width=\"847\" height=\"565\" data-src=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-05-1024x683.jpg\" class=\"attachment-large size-large lazyload\" alt=\"\" data-srcset=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-05-1024x683.jpg 1024w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-05-300x200.jpg 300w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-05-768x512.jpg 768w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-05-1200x800.jpg 1200w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-05.jpg 1920w\" data-sizes=\"(max-width: 847px) 100vw, 847px\" data-id=\"12163\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 847px; --smush-placeholder-aspect-ratio: 847\/565;\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-06.jpg'><img decoding=\"async\" width=\"847\" height=\"565\" data-src=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-06-1024x683.jpg\" class=\"attachment-large size-large lazyload\" alt=\"\" data-srcset=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-06-1024x683.jpg 1024w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-06-300x200.jpg 300w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-06-768x512.jpg 768w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-06-1200x800.jpg 1200w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-06.jpg 1920w\" data-sizes=\"(max-width: 847px) 100vw, 847px\" data-id=\"12164\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 847px; --smush-placeholder-aspect-ratio: 847\/565;\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-07.jpg'><img decoding=\"async\" width=\"847\" height=\"565\" data-src=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-07-1024x683.jpg\" class=\"attachment-large size-large lazyload\" alt=\"\" data-srcset=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-07-1024x683.jpg 1024w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-07-300x200.jpg 300w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-07-768x512.jpg 768w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-07-1200x800.jpg 1200w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-07.jpg 1920w\" data-sizes=\"(max-width: 847px) 100vw, 847px\" data-id=\"12165\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 847px; --smush-placeholder-aspect-ratio: 847\/565;\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-08.jpg'><img decoding=\"async\" width=\"847\" height=\"565\" data-src=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-08-1024x683.jpg\" class=\"attachment-large size-large lazyload\" alt=\"\" data-srcset=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-08-1024x683.jpg 1024w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-08-300x200.jpg 300w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-08-768x512.jpg 768w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-08-1200x800.jpg 1200w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-08.jpg 1920w\" data-sizes=\"(max-width: 847px) 100vw, 847px\" data-id=\"12159\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 847px; --smush-placeholder-aspect-ratio: 847\/565;\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-09.jpg'><img decoding=\"async\" width=\"847\" height=\"565\" data-src=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-09-1024x683.jpg\" class=\"attachment-large size-large lazyload\" alt=\"\" data-srcset=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-09-1024x683.jpg 1024w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-09-300x200.jpg 300w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-09-768x512.jpg 768w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-09-1200x800.jpg 1200w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-09.jpg 1920w\" data-sizes=\"(max-width: 847px) 100vw, 847px\" data-id=\"12166\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 847px; --smush-placeholder-aspect-ratio: 847\/565;\" \/><\/a>\n\t\t\t<\/div><\/figure>\n\t\t<\/div>\n\n","protected":false},"featured_media":12159,"template":"","projects":[329,390],"skills":[331,337],"countries":[333,332],"class_list":["post-12157","tm_portfolio","type-tm_portfolio","status-publish","has-post-thumbnail","hentry","tm_portfolio_category-supply-infrastructures","projects-all","projects-supply-infrastructures","skills-all","skills-infrastructures","countries-all","countries-portugal-en"],"metadata":{"_wpml_media_has_media":"1","_yoast_wpseo_metadesc":"This project was characterized by the construction of an industrial building with about 30,000 m2.","slide_template":"default","_wpb_vc_js_status":"false","_themetechmount_metabox_group":{"slidertype":"","revslider":"tectxon-classic-slider","customslider":"","slider_width":"wide","custom_background":{"image":"","imageid":"","repeat":"","position":"","attachment":"","size":"","color":""},"custom_inner_background":{"image":"","imageid":"","repeat":"","position":"","attachment":"","size":"","color":""},"show_topbar":"","topbar_bg_color":"","topbar_bg_custom_color":"#dd3333","topbar_text_color":"","topbar_text_custom_color":"rgba(0, 0, 255, 0.25)","topbar_left_text":"","topbar_right_text":"","title":"","subtitle":"","titlebar_bg_custom_options":"custom","titlebar_bg_color":"darkgrey","titlebar_background":{"image":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-07.jpg","imageid":"6042","repeat":"no-repeat","position":"center bottom","attachment":"fixed","size":"cover","color":""},"titlebar_font_custom_options":"","titlebar_text_color":"white","titlebar_heading_font":{"family":"Arimo","backup-family":"Arial, Helvetica, sans-serif","variant":"regular","text-transform":"","font-size":"14","line-height":"16","letter-spacing":"0","color":"#202020","font":"google"},"titlebar_subheading_font":{"family":"Arimo","backup-family":"Arial, Helvetica, sans-serif","variant":"regular","text-transform":"","font-size":"14","line-height":"16","letter-spacing":"0","color":"#202020","font":"google"},"titlebar_breadcrumb_font":{"family":"Arimo","backup-family":"Arial, Helvetica, sans-serif","variant":"regular","text-transform":"","font-size":"14","line-height":"16","letter-spacing":"0","color":"#202020","font":"google"},"titlebar_view":"allleft","titlebar_height":"","titlebar_hide_breadcrumb":"","skincolor":"","custom_background_switcher":false,"hide_titlebar":false},"_themetechmount_metabox_sidebar":{"sidebar":"no","left_sidebar":"","right_sidebar":""},"themetechmount_page_row_settings":{"row_lower_padding":false},"themetechmount_portfolio_list_data":{"tm_pf_list_data":{"pf_details_line_0":"Interceptor Cais do Sodr\u00e9\/Alc\u00e2ntara II","pf_details_line_1":"SIMTEJO, S.A.","pf_details_line_2":"Infraestruturas de Abastecimento","pf_details_line_3":"Lisboa - Portugal","pf_details_line_4":"2010"}},"themetechmount_portfolio_featured":{"featuredtype":"image","video_code":"","audio_code":"","slide_images":""},"themetechmount_portfolio_view":{"viewstyle":"full-withimg"},"themetechmount_portfolio_like":"","themetechmount_likes":"0","_yoast_wpseo_content_score":"60","_yoast_wpseo_primary_tm_portfolio_category":"","_wp_old_date":"2019-04-17","_wpml_media_featured":"1","_wpml_media_duplicate":"1","_wpml_location_migration_done":"1","_thumbnail_id":"12159","_edit_lock":"1564994284:2","_edit_last":"2","_wp_old_slug":"interceptor-cais-do-sodre-alcantara-ii","_reuseb_geobox_preview":"{}","_yoast_wpseo_primary_projects":"","_yoast_wpseo_primary_skills":"","_yoast_wpseo_primary_countries":"","_last_translation_edit_mode":"native-editor"},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.7 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Sewers Catch System At The Cais Do Sodr\u00e9\/Alc\u00e2ntara II - Teixeira Duarte Constru\u00e7\u00e3o<\/title>\n<meta name=\"description\" content=\"This project was characterized by the construction of an industrial building with about 30,000 m2.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/sewers-catch-system-at-the-cais-do-sodre-alcantara-ii\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Sewers Catch System At The Cais Do Sodr\u00e9\/Alc\u00e2ntara II - Teixeira Duarte Constru\u00e7\u00e3o\" \/>\n<meta property=\"og:description\" content=\"This project was characterized by the construction of an industrial building with about 30,000 m2.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/sewers-catch-system-at-the-cais-do-sodre-alcantara-ii\/\" \/>\n<meta property=\"og:site_name\" content=\"Teixeira Duarte Constru\u00e7\u00e3o\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/teixeiraduarteconstrucao\/?locale=pt_PT\" \/>\n<meta property=\"article:modified_time\" content=\"2019-08-05T08:32:15+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-08.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1280\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/sewers-catch-system-at-the-cais-do-sodre-alcantara-ii\/\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/sewers-catch-system-at-the-cais-do-sodre-alcantara-ii\/\",\"name\":\"Sewers Catch System At The Cais Do Sodr\u00e9\/Alc\u00e2ntara II - Teixeira Duarte Constru\u00e7\u00e3o\",\"isPartOf\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/sewers-catch-system-at-the-cais-do-sodre-alcantara-ii\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/sewers-catch-system-at-the-cais-do-sodre-alcantara-ii\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-08.jpg\",\"datePublished\":\"2019-04-21T23:46:09+00:00\",\"dateModified\":\"2019-08-05T08:32:15+00:00\",\"description\":\"This project was characterized by the construction of an industrial building with about 30,000 m2.\",\"breadcrumb\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/sewers-catch-system-at-the-cais-do-sodre-alcantara-ii\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/sewers-catch-system-at-the-cais-do-sodre-alcantara-ii\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/sewers-catch-system-at-the-cais-do-sodre-alcantara-ii\/#primaryimage\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-08.jpg\",\"contentUrl\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-08.jpg\",\"width\":1920,\"height\":1280},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/sewers-catch-system-at-the-cais-do-sodre-alcantara-ii\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"In\u00edcio\",\"item\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Sewers Catch System At The Cais Do Sodr\u00e9\/Alc\u00e2ntara II\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#website\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/\",\"name\":\"Teixeira Duarte Constru\u00e7\u00e3o\",\"description\":\"Pioneirismo e Inova\u00e7\u00e3o desde 1921\",\"publisher\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization\",\"name\":\"Teixeira Duarte - Engenharia e Constru\u00e7\u00f5es, S.A.\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2025\/04\/Logotipo-Teixeira-Duarte-EC-2024-positivo.png\",\"contentUrl\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2025\/04\/Logotipo-Teixeira-Duarte-EC-2024-positivo.png\",\"width\":3544,\"height\":1182,\"caption\":\"Teixeira Duarte - Engenharia e Constru\u00e7\u00f5es, S.A.\"},\"image\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/teixeiraduarteconstrucao\/?locale=pt_PT\",\"https:\/\/www.linkedin.com\/company\/teixeira-duarte-engenharia-e-construcoes\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Sewers Catch System At The Cais Do Sodr\u00e9\/Alc\u00e2ntara II - Teixeira Duarte Constru\u00e7\u00e3o","description":"This project was characterized by the construction of an industrial building with about 30,000 m2.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/sewers-catch-system-at-the-cais-do-sodre-alcantara-ii\/","og_locale":"en_US","og_type":"article","og_title":"Sewers Catch System At The Cais Do Sodr\u00e9\/Alc\u00e2ntara II - Teixeira Duarte Constru\u00e7\u00e3o","og_description":"This project was characterized by the construction of an industrial building with about 30,000 m2.","og_url":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/sewers-catch-system-at-the-cais-do-sodre-alcantara-ii\/","og_site_name":"Teixeira Duarte Constru\u00e7\u00e3o","article_publisher":"https:\/\/www.facebook.com\/teixeiraduarteconstrucao\/?locale=pt_PT","article_modified_time":"2019-08-05T08:32:15+00:00","og_image":[{"width":1920,"height":1280,"url":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-08.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/sewers-catch-system-at-the-cais-do-sodre-alcantara-ii\/","url":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/sewers-catch-system-at-the-cais-do-sodre-alcantara-ii\/","name":"Sewers Catch System At The Cais Do Sodr\u00e9\/Alc\u00e2ntara II - Teixeira Duarte Constru\u00e7\u00e3o","isPartOf":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/sewers-catch-system-at-the-cais-do-sodre-alcantara-ii\/#primaryimage"},"image":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/sewers-catch-system-at-the-cais-do-sodre-alcantara-ii\/#primaryimage"},"thumbnailUrl":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-08.jpg","datePublished":"2019-04-21T23:46:09+00:00","dateModified":"2019-08-05T08:32:15+00:00","description":"This project was characterized by the construction of an industrial building with about 30,000 m2.","breadcrumb":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/sewers-catch-system-at-the-cais-do-sodre-alcantara-ii\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/sewers-catch-system-at-the-cais-do-sodre-alcantara-ii\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/sewers-catch-system-at-the-cais-do-sodre-alcantara-ii\/#primaryimage","url":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-08.jpg","contentUrl":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/interceptor-caisodre-alc-08.jpg","width":1920,"height":1280},{"@type":"BreadcrumbList","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/sewers-catch-system-at-the-cais-do-sodre-alcantara-ii\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"In\u00edcio","item":"https:\/\/teixeiraduarteconstrucao.com\/en\/"},{"@type":"ListItem","position":2,"name":"Sewers Catch System At The Cais Do Sodr\u00e9\/Alc\u00e2ntara II"}]},{"@type":"WebSite","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#website","url":"https:\/\/teixeiraduarteconstrucao.com\/en\/","name":"Teixeira Duarte Constru\u00e7\u00e3o","description":"Pioneirismo e Inova\u00e7\u00e3o desde 1921","publisher":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/teixeiraduarteconstrucao.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization","name":"Teixeira Duarte - Engenharia e Constru\u00e7\u00f5es, S.A.","url":"https:\/\/teixeiraduarteconstrucao.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2025\/04\/Logotipo-Teixeira-Duarte-EC-2024-positivo.png","contentUrl":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2025\/04\/Logotipo-Teixeira-Duarte-EC-2024-positivo.png","width":3544,"height":1182,"caption":"Teixeira Duarte - Engenharia e Constru\u00e7\u00f5es, S.A."},"image":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/teixeiraduarteconstrucao\/?locale=pt_PT","https:\/\/www.linkedin.com\/company\/teixeira-duarte-engenharia-e-construcoes"]}]}},"_links":{"self":[{"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/tm_portfolio\/12157","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/tm_portfolio"}],"about":[{"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/types\/tm_portfolio"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/media\/12159"}],"wp:attachment":[{"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/media?parent=12157"}],"wp:term":[{"taxonomy":"projects","embeddable":true,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/projects?post=12157"},{"taxonomy":"skills","embeddable":true,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/skills?post=12157"},{"taxonomy":"countries","embeddable":true,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/countries?post=12157"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}