{"id":12097,"date":"2019-04-18T14:49:16","date_gmt":"2019-04-18T14:49:16","guid":{"rendered":"https:\/\/teixeiraduarteconstrucao.com\/projetos\/reabilitacao-e-requalificacao-da-central-de-valorizacao-organica-sao-bras-alportel\/"},"modified":"2019-08-02T15:49:15","modified_gmt":"2019-08-02T15:49:15","slug":"1st-stage-of-the-rehabilitation-and-requalification-upgrading-of-sao-bras-de-alportel-organic-waste-processing-plant","status":"publish","type":"tm_portfolio","link":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/1st-stage-of-the-rehabilitation-and-requalification-upgrading-of-sao-bras-de-alportel-organic-waste-processing-plant\/","title":{"rendered":"1st Stage Of The Rehabilitation And Requalification (Upgrading) Of S\u00e3o Br\u00e1s De Alportel Organic Waste Processing Plant"},"content":{"rendered":"<h1><strong>1<\/strong><strong><sup>st<\/sup><\/strong><strong> STAGE OF THE REHABILITATION AND REQUALIFICATION (UPGRADING) <\/strong><strong>OF S\u00c3O BR\u00c1S DE ALPORTEL ORGANIC WASTE PROCESSING PLANT<\/strong><\/h1>\n<p><strong>Owner<\/strong>: <span class=\"fontstyle0\">ALGAR &#8211; Valoriza\u00e7\u00e3o e Tratamento de Res\u00edduos S\u00f3lidos, S.A.<\/span><br \/>\n<strong>Site<\/strong>: <span class=\"fontstyle0\">S\u00e3o Br\u00e1s de Alportel &#8211; Faro &#8211; Portugal<\/span><br \/>\n<strong>Conclusion year<\/strong>: 2013<\/p>\n<p>&nbsp;<\/p>\n<p>This contract job comprised the following activities:<\/p>\n<p>&nbsp;<\/p>\n<p>&#8211; Repair of the reinforced concrete elements;<\/p>\n<p>&#8211; Treatment of reinforced concrete surfaces;<\/p>\n<p>&#8211; Treatment of steel surfaces;<\/p>\n<p>&#8211; Reinforced concrete structures;<\/p>\n<p>&#8211; Demolition of concrete pavements;<\/p>\n<p>&#8211; Earth moving works\/earthworks;<\/p>\n<p>&#8211; Waterproofing;<\/p>\n<p>&#8211; Automatic gates;<\/p>\n<p>&#8211; Soil consolidation using cement slurry grouting;<\/p>\n<p>&#8211; Seismic reinforcement using metal structures;<\/p>\n<p>&#8211; Electrical installations;<\/p>\n<p>&#8211; Electromechanical installations;<\/p>\n<p>&#8211; HVAC installations;<\/p>\n<p>&#8211; Hydraulic installations;<\/p>\n<p>&#8211; Fire-fighting safety;<\/p>\n<p>&nbsp;<\/p>\n<p>Main Quantities:<\/p>\n<p>&nbsp;<\/p>\n<p>Repair of the concrete elements\u00a0 450 m2<\/p>\n<p>Sealing and treatment of cracks and joints\u00a0 2\u00a0300 ml<\/p>\n<p>Protective painting of the concrete elements\u00a0 2\u00a0050 m2<\/p>\n<p>Pickling and painting of metal silos\u00a0 2\u00a0100 m2<\/p>\n<p>Concrete for structural elements\u00a0 430 m3<\/p>\n<p>Steel for reinforced concrete elements\u00a0 35\u00a0550 kg<\/p>\n<p>Steel for seismic reinforcement structures\u00a0 27\u00a0000 kg<\/p>\n<p>Steel tethers for seismic reinforcement\u00a0 688 un<\/p>\n<p>Formworks\u00a0 960 m2<\/p>\n<p>Demolition of concrete pavements\u00a0 3\u00a0300 m2<\/p>\n<p>Execution of finished concrete pavements\u00a0 3\u00a0300 m2<\/p>\n<p>Excavation and landfill\u00a0 7\u00a0200 m3<\/p>\n<p>Roofing waterproofing\u00a0 820 m2<\/p>\n<p>Cement slurry grouting on foundation soils\u00a0 80 m3<\/p>\n<p>Transformer substation\u00a0 1 un<\/p>\n<p>Emergency generator unit\u00a0 1 un<\/p>\n<p>Deodorizing system by activated carbon filter\u00a0 1 un<\/p>\n<div id='gallery-1' class='gallery galleryid-12097 gallery-columns-3 gallery-size-large'><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/central-Sbras-alportel-01.jpg'><img decoding=\"async\" width=\"847\" height=\"565\" data-src=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/central-Sbras-alportel-01-1024x683.jpg\" class=\"attachment-large size-large lazyload\" alt=\"\" data-srcset=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/central-Sbras-alportel-01-1024x683.jpg 1024w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/central-Sbras-alportel-01-300x200.jpg 300w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/central-Sbras-alportel-01-768x512.jpg 768w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/central-Sbras-alportel-01-1200x800.jpg 1200w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/central-Sbras-alportel-01.jpg 1920w\" data-sizes=\"(max-width: 847px) 100vw, 847px\" data-id=\"12098\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 847px; --smush-placeholder-aspect-ratio: 847\/565;\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/central-Sbras-alportel-02.jpg'><img decoding=\"async\" width=\"847\" height=\"565\" data-src=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/central-Sbras-alportel-02-1024x683.jpg\" class=\"attachment-large size-large lazyload\" alt=\"\" data-srcset=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/central-Sbras-alportel-02-1024x683.jpg 1024w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/central-Sbras-alportel-02-300x200.jpg 300w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/central-Sbras-alportel-02-768x512.jpg 768w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/central-Sbras-alportel-02-1200x800.jpg 1200w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/central-Sbras-alportel-02.jpg 1920w\" data-sizes=\"(max-width: 847px) 100vw, 847px\" data-id=\"12099\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 847px; --smush-placeholder-aspect-ratio: 847\/565;\" \/><\/a>\n\t\t\t<\/div><\/figure>\n\t\t<\/div>\n\n","protected":false},"featured_media":12099,"template":"","projects":[329,380],"skills":[331,337],"countries":[333,332],"class_list":["post-12097","tm_portfolio","type-tm_portfolio","status-publish","has-post-thumbnail","hentry","tm_portfolio_category-environmental-buildings","projects-all","projects-environmental-buildings","skills-all","skills-infrastructures","countries-all","countries-portugal-en"],"metadata":{"_wpml_media_has_media":"1","themetechmount_portfolio_featured":{"featuredtype":"image","video_code":"","audio_code":"","slide_images":""},"themetechmount_portfolio_view":{"viewstyle":"full-withimg"},"themetechmount_portfolio_like":"","themetechmount_likes":"0","_yoast_wpseo_content_score":"60","_yoast_wpseo_primary_tm_portfolio_category":"","themetechmount_portfolio_list_data":{"tm_pf_list_data":{"pf_details_line_0":"1\u00aa Fase de Reabilita\u00e7\u00e3o e Requalifica\u00e7\u00e3o da Central de Valoriza\u00e7\u00e3o Org\u00e2nica de S\u00e3o Br\u00e1s de Alportel","pf_details_line_1":"Algar, S.A.","pf_details_line_2":"Constru\u00e7\u00f5es Ambientais","pf_details_line_3":"S\u00e3o Br\u00e1s de Alportel - Portugal","pf_details_line_4":"2013"}},"themetechmount_page_row_settings":{"row_lower_padding":false},"_wpb_vc_js_status":"false","_themetechmount_metabox_group":{"slidertype":"","revslider":"tectxon-classic-slider","customslider":"","slider_width":"wide","custom_background":{"image":"","imageid":"","repeat":"","position":"","attachment":"","size":"","color":""},"custom_inner_background":{"image":"","imageid":"","repeat":"","position":"","attachment":"","size":"","color":""},"show_topbar":"","topbar_bg_color":"","topbar_bg_custom_color":"#dd3333","topbar_text_color":"","topbar_text_custom_color":"rgba(0, 0, 255, 0.25)","topbar_left_text":"","topbar_right_text":"","title":"","subtitle":"","titlebar_bg_custom_options":"custom","titlebar_bg_color":"darkgrey","titlebar_background":{"image":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/central-Sbras-alportel-01.jpg","imageid":"5389","repeat":"no-repeat","position":"center center","attachment":"fixed","size":"cover","color":""},"titlebar_font_custom_options":"","titlebar_text_color":"white","titlebar_heading_font":{"family":"Arimo","backup-family":"Arial, Helvetica, sans-serif","variant":"regular","text-transform":"","font-size":"14","line-height":"16","letter-spacing":"0","color":"#202020","font":"google"},"titlebar_subheading_font":{"family":"Arimo","backup-family":"Arial, Helvetica, sans-serif","variant":"regular","text-transform":"","font-size":"14","line-height":"16","letter-spacing":"0","color":"#202020","font":"google"},"titlebar_breadcrumb_font":{"family":"Arimo","backup-family":"Arial, Helvetica, sans-serif","variant":"regular","text-transform":"","font-size":"14","line-height":"16","letter-spacing":"0","color":"#202020","font":"google"},"titlebar_view":"allleft","titlebar_height":"","titlebar_hide_breadcrumb":"","skincolor":"","custom_background_switcher":false,"hide_titlebar":false},"slide_template":"default","_themetechmount_metabox_sidebar":{"sidebar":"no","left_sidebar":"","right_sidebar":""},"_wp_old_date":"2019-04-17","_reuseb_geobox_preview":"{}","_yoast_wpseo_primary_skills_br":"","_yoast_wpseo_primary_projectos_br":"","_yoast_wpseo_primary_projects":"","_yoast_wpseo_primary_skills":"","_yoast_wpseo_primary_countries":"","_thumbnail_id":"12099","_edit_lock":"1564761022:4","_edit_last":"4","_wp_old_slug":"reabilitacao-e-requalificacao-da-central-de-valorizacao-organica-sao-bras-alportel","_last_translation_edit_mode":"native-editor","_wpml_media_duplicate":"0","_wpml_media_featured":"0"},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.7 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>1st Stage Of The Rehabilitation And Requalification (Upgrading) Of S\u00e3o Br\u00e1s De Alportel Organic Waste Processing Plant - Teixeira Duarte Constru\u00e7\u00e3o<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/1st-stage-of-the-rehabilitation-and-requalification-upgrading-of-sao-bras-de-alportel-organic-waste-processing-plant\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"1st Stage Of The Rehabilitation And Requalification (Upgrading) Of S\u00e3o Br\u00e1s De Alportel Organic Waste Processing Plant - Teixeira Duarte Constru\u00e7\u00e3o\" \/>\n<meta property=\"og:description\" content=\"1st STAGE OF THE REHABILITATION AND REQUALIFICATION (UPGRADING) OF S\u00c3O BR\u00c1S DE ALPORTEL ORGANIC WASTE PROCESSING PLANT Owner: ALGAR &#8211; Valoriza\u00e7\u00e3o e Tratamento de Res\u00edduos S\u00f3lidos, S.A. Site: S\u00e3o Br\u00e1s de Alportel &#8211; Faro &#8211; Portugal Conclusion year: 2013 &nbsp; This contract job comprised the following activities: &nbsp; &#8211; Repair of the reinforced concrete elements; &hellip; Continue reading 1st Stage Of The Rehabilitation And Requalification (Upgrading) Of S\u00e3o Br\u00e1s De Alportel Organic Waste Processing Plant\" \/>\n<meta property=\"og:url\" content=\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/1st-stage-of-the-rehabilitation-and-requalification-upgrading-of-sao-bras-de-alportel-organic-waste-processing-plant\/\" \/>\n<meta property=\"og:site_name\" content=\"Teixeira Duarte Constru\u00e7\u00e3o\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/teixeiraduarteconstrucao\/?locale=pt_PT\" \/>\n<meta property=\"article:modified_time\" content=\"2019-08-02T15:49:15+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/central-Sbras-alportel-02.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1280\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/1st-stage-of-the-rehabilitation-and-requalification-upgrading-of-sao-bras-de-alportel-organic-waste-processing-plant\/\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/1st-stage-of-the-rehabilitation-and-requalification-upgrading-of-sao-bras-de-alportel-organic-waste-processing-plant\/\",\"name\":\"1st Stage Of The Rehabilitation And Requalification (Upgrading) Of S\u00e3o Br\u00e1s De Alportel Organic Waste Processing Plant - Teixeira Duarte Constru\u00e7\u00e3o\",\"isPartOf\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/1st-stage-of-the-rehabilitation-and-requalification-upgrading-of-sao-bras-de-alportel-organic-waste-processing-plant\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/1st-stage-of-the-rehabilitation-and-requalification-upgrading-of-sao-bras-de-alportel-organic-waste-processing-plant\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/central-Sbras-alportel-02.jpg\",\"datePublished\":\"2019-04-18T14:49:16+00:00\",\"dateModified\":\"2019-08-02T15:49:15+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/1st-stage-of-the-rehabilitation-and-requalification-upgrading-of-sao-bras-de-alportel-organic-waste-processing-plant\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/1st-stage-of-the-rehabilitation-and-requalification-upgrading-of-sao-bras-de-alportel-organic-waste-processing-plant\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/1st-stage-of-the-rehabilitation-and-requalification-upgrading-of-sao-bras-de-alportel-organic-waste-processing-plant\/#primaryimage\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/central-Sbras-alportel-02.jpg\",\"contentUrl\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/central-Sbras-alportel-02.jpg\",\"width\":1920,\"height\":1280},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/1st-stage-of-the-rehabilitation-and-requalification-upgrading-of-sao-bras-de-alportel-organic-waste-processing-plant\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"In\u00edcio\",\"item\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"1st Stage Of The Rehabilitation And Requalification (Upgrading) Of S\u00e3o Br\u00e1s De Alportel Organic Waste Processing Plant\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#website\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/\",\"name\":\"Teixeira Duarte Constru\u00e7\u00e3o\",\"description\":\"Pioneirismo e Inova\u00e7\u00e3o desde 1921\",\"publisher\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization\",\"name\":\"Teixeira Duarte - Engenharia e Constru\u00e7\u00f5es, S.A.\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2025\/04\/Logotipo-Teixeira-Duarte-EC-2024-positivo.png\",\"contentUrl\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2025\/04\/Logotipo-Teixeira-Duarte-EC-2024-positivo.png\",\"width\":3544,\"height\":1182,\"caption\":\"Teixeira Duarte - Engenharia e Constru\u00e7\u00f5es, S.A.\"},\"image\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/teixeiraduarteconstrucao\/?locale=pt_PT\",\"https:\/\/www.linkedin.com\/company\/teixeira-duarte-engenharia-e-construcoes\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"1st Stage Of The Rehabilitation And Requalification (Upgrading) Of S\u00e3o Br\u00e1s De Alportel Organic Waste Processing Plant - Teixeira Duarte Constru\u00e7\u00e3o","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/1st-stage-of-the-rehabilitation-and-requalification-upgrading-of-sao-bras-de-alportel-organic-waste-processing-plant\/","og_locale":"en_US","og_type":"article","og_title":"1st Stage Of The Rehabilitation And Requalification (Upgrading) Of S\u00e3o Br\u00e1s De Alportel Organic Waste Processing Plant - Teixeira Duarte Constru\u00e7\u00e3o","og_description":"1st STAGE OF THE REHABILITATION AND REQUALIFICATION (UPGRADING) OF S\u00c3O BR\u00c1S DE ALPORTEL ORGANIC WASTE PROCESSING PLANT Owner: ALGAR &#8211; Valoriza\u00e7\u00e3o e Tratamento de Res\u00edduos S\u00f3lidos, S.A. Site: S\u00e3o Br\u00e1s de Alportel &#8211; Faro &#8211; Portugal Conclusion year: 2013 &nbsp; This contract job comprised the following activities: &nbsp; &#8211; Repair of the reinforced concrete elements; &hellip; Continue reading 1st Stage Of The Rehabilitation And Requalification (Upgrading) Of S\u00e3o Br\u00e1s De Alportel Organic Waste Processing Plant","og_url":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/1st-stage-of-the-rehabilitation-and-requalification-upgrading-of-sao-bras-de-alportel-organic-waste-processing-plant\/","og_site_name":"Teixeira Duarte Constru\u00e7\u00e3o","article_publisher":"https:\/\/www.facebook.com\/teixeiraduarteconstrucao\/?locale=pt_PT","article_modified_time":"2019-08-02T15:49:15+00:00","og_image":[{"width":1920,"height":1280,"url":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/central-Sbras-alportel-02.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/1st-stage-of-the-rehabilitation-and-requalification-upgrading-of-sao-bras-de-alportel-organic-waste-processing-plant\/","url":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/1st-stage-of-the-rehabilitation-and-requalification-upgrading-of-sao-bras-de-alportel-organic-waste-processing-plant\/","name":"1st Stage Of The Rehabilitation And Requalification (Upgrading) Of S\u00e3o Br\u00e1s De Alportel Organic Waste Processing Plant - Teixeira Duarte Constru\u00e7\u00e3o","isPartOf":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/1st-stage-of-the-rehabilitation-and-requalification-upgrading-of-sao-bras-de-alportel-organic-waste-processing-plant\/#primaryimage"},"image":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/1st-stage-of-the-rehabilitation-and-requalification-upgrading-of-sao-bras-de-alportel-organic-waste-processing-plant\/#primaryimage"},"thumbnailUrl":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/central-Sbras-alportel-02.jpg","datePublished":"2019-04-18T14:49:16+00:00","dateModified":"2019-08-02T15:49:15+00:00","breadcrumb":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/1st-stage-of-the-rehabilitation-and-requalification-upgrading-of-sao-bras-de-alportel-organic-waste-processing-plant\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/1st-stage-of-the-rehabilitation-and-requalification-upgrading-of-sao-bras-de-alportel-organic-waste-processing-plant\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/1st-stage-of-the-rehabilitation-and-requalification-upgrading-of-sao-bras-de-alportel-organic-waste-processing-plant\/#primaryimage","url":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/central-Sbras-alportel-02.jpg","contentUrl":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/04\/central-Sbras-alportel-02.jpg","width":1920,"height":1280},{"@type":"BreadcrumbList","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/1st-stage-of-the-rehabilitation-and-requalification-upgrading-of-sao-bras-de-alportel-organic-waste-processing-plant\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"In\u00edcio","item":"https:\/\/teixeiraduarteconstrucao.com\/en\/"},{"@type":"ListItem","position":2,"name":"1st Stage Of The Rehabilitation And Requalification (Upgrading) Of S\u00e3o Br\u00e1s De Alportel Organic Waste Processing Plant"}]},{"@type":"WebSite","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#website","url":"https:\/\/teixeiraduarteconstrucao.com\/en\/","name":"Teixeira Duarte Constru\u00e7\u00e3o","description":"Pioneirismo e Inova\u00e7\u00e3o desde 1921","publisher":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/teixeiraduarteconstrucao.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization","name":"Teixeira Duarte - Engenharia e Constru\u00e7\u00f5es, S.A.","url":"https:\/\/teixeiraduarteconstrucao.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2025\/04\/Logotipo-Teixeira-Duarte-EC-2024-positivo.png","contentUrl":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2025\/04\/Logotipo-Teixeira-Duarte-EC-2024-positivo.png","width":3544,"height":1182,"caption":"Teixeira Duarte - Engenharia e Constru\u00e7\u00f5es, S.A."},"image":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/teixeiraduarteconstrucao\/?locale=pt_PT","https:\/\/www.linkedin.com\/company\/teixeira-duarte-engenharia-e-construcoes"]}]}},"_links":{"self":[{"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/tm_portfolio\/12097","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/tm_portfolio"}],"about":[{"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/types\/tm_portfolio"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/media\/12099"}],"wp:attachment":[{"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/media?parent=12097"}],"wp:term":[{"taxonomy":"projects","embeddable":true,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/projects?post=12097"},{"taxonomy":"skills","embeddable":true,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/skills?post=12097"},{"taxonomy":"countries","embeddable":true,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/countries?post=12097"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}