{"id":9154,"date":"2019-03-21T14:37:53","date_gmt":"2019-03-21T14:37:53","guid":{"rendered":"https:\/\/teixeiraduarteconstrucao.com\/teixeira-duarte-ganha-construcao-de-tunel-na-baixa-do-porto\/"},"modified":"2019-08-13T08:39:12","modified_gmt":"2019-08-13T08:39:12","slug":"teixeira-duarte-wins-contract-for-road-tunnel-in-downtown-porto","status":"publish","type":"post","link":"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-wins-contract-for-road-tunnel-in-downtown-porto\/","title":{"rendered":"Teixeira Duarte wins contract for road tunnel in downtown Porto"},"content":{"rendered":"<p><strong>On 4 March, Teixeira Duarte &#8211; Engenharia e Constru\u00e7\u00f5es, S.A. (TD-EC) and Gest\u00e3o de Obras do Porto, E.M. signed a work order contract for construction of a tunnel connecting Rua do Ateneu Comercial do Porto to Rua Alexandre Braga, totalling \u20ac4,367,613.54 and due to be completed in 365 days.<\/strong><\/p>\n<p>The works in question are part of the wider project for restoring and refurbishing of the Bolh\u00e3o Market.<\/p>\n<p>According to the project specifications, there was a need to build an underground road tunnel providing access to the new basements planned for the market precinct. This access will be provided via Rua do Ateneu Comercial do Porto, making use of existing street-level stories and the corresponding stories at level -2 at Rua Formosa.<\/p>\n<p>The works are essential for the operation of Bolh\u00e3o Market, as the new access will allow entry of goods, exit of products in amounts requiring road vehicle transport, entry for providers of support services to the Market, exit of waste, etc.<\/p>\n<ul>\n<li>The construction of a tunnel connecting Rua do Ateneu Comercial do Porto to Rua Alexandre Braga, of approximately 120 metres in length;<\/li>\n<li>The partial refurbishment of the buildings at nos 325, 327 and 329 Rua Formosa;<\/li>\n<li>The construction of new buildings 2, 4 and 6 on Rua do Ateneu Comercial do Porto and Rua de Ant\u00f3nio Pedro, two levels above the tunnel&#8217;s roof slab, replacing the existing buildings that are due for demolition.<\/li>\n<\/ul>\n<p>The study for this tender was carried out by the Infrastructures Department, but involved the cooperation of other sectors at TD-EC, with a special mention due for the involvement of the Project Department in researching the best building processes, bearing in mind the specifics of some of the work to be undertaken.<\/p>\n<p><!--\/codes_iframe--><\/p>\n","protected":false},"excerpt":{"rendered":"<p>On 4 March, Teixeira Duarte &#8211; Engenharia e Constru\u00e7\u00f5es, S.A. (TD-EC) and Gest\u00e3o de Obras do Porto, E.M. signed a work order contract for construction of a tunnel connecting Rua do Ateneu Comercial do Porto to Rua Alexandre Braga, totalling \u20ac4,367,613.54 and due to be completed in 365 days. The works in question are part &hellip; <a href=\"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-wins-contract-for-road-tunnel-in-downtown-porto\/\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">Teixeira Duarte wins contract for road tunnel in downtown Porto<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":9155,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[230],"tags":[],"class_list":["post-9154","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.7 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Teixeira Duarte wins contract for road tunnel in downtown Porto - Teixeira Duarte Constru\u00e7\u00e3o<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-wins-contract-for-road-tunnel-in-downtown-porto\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Teixeira Duarte wins contract for road tunnel in downtown Porto - Teixeira Duarte Constru\u00e7\u00e3o\" \/>\n<meta property=\"og:description\" content=\"On 4 March, Teixeira Duarte &#8211; Engenharia e Constru\u00e7\u00f5es, S.A. (TD-EC) and Gest\u00e3o de Obras do Porto, E.M. signed a work order contract for construction of a tunnel connecting Rua do Ateneu Comercial do Porto to Rua Alexandre Braga, totalling \u20ac4,367,613.54 and due to be completed in 365 days. The works in question are part &hellip; Continue reading Teixeira Duarte wins contract for road tunnel in downtown Porto\" \/>\n<meta property=\"og:url\" content=\"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-wins-contract-for-road-tunnel-in-downtown-porto\/\" \/>\n<meta property=\"og:site_name\" content=\"Teixeira Duarte Constru\u00e7\u00e3o\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/teixeiraduarteconstrucao\/?locale=pt_PT\" \/>\n<meta property=\"article:published_time\" content=\"2019-03-21T14:37:53+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2019-08-13T08:39:12+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/05\/tunel-bolhao.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"760\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Lu\u00eds Feliciano\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Lu\u00eds Feliciano\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-wins-contract-for-road-tunnel-in-downtown-porto\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-wins-contract-for-road-tunnel-in-downtown-porto\/\"},\"author\":{\"name\":\"Lu\u00eds Feliciano\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/person\/4b4049563529446ad1d92c476be6c187\"},\"headline\":\"Teixeira Duarte wins contract for road tunnel in downtown Porto\",\"datePublished\":\"2019-03-21T14:37:53+00:00\",\"dateModified\":\"2019-08-13T08:39:12+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-wins-contract-for-road-tunnel-in-downtown-porto\/\"},\"wordCount\":294,\"publisher\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-wins-contract-for-road-tunnel-in-downtown-porto\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/05\/tunel-bolhao.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-wins-contract-for-road-tunnel-in-downtown-porto\/\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-wins-contract-for-road-tunnel-in-downtown-porto\/\",\"name\":\"Teixeira Duarte wins contract for road tunnel in downtown Porto - Teixeira Duarte Constru\u00e7\u00e3o\",\"isPartOf\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-wins-contract-for-road-tunnel-in-downtown-porto\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-wins-contract-for-road-tunnel-in-downtown-porto\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/05\/tunel-bolhao.jpg\",\"datePublished\":\"2019-03-21T14:37:53+00:00\",\"dateModified\":\"2019-08-13T08:39:12+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-wins-contract-for-road-tunnel-in-downtown-porto\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-wins-contract-for-road-tunnel-in-downtown-porto\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-wins-contract-for-road-tunnel-in-downtown-porto\/#primaryimage\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/05\/tunel-bolhao.jpg\",\"contentUrl\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/05\/tunel-bolhao.jpg\",\"width\":1920,\"height\":760},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-wins-contract-for-road-tunnel-in-downtown-porto\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"In\u00edcio\",\"item\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Teixeira Duarte wins contract for road tunnel in downtown Porto\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#website\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/\",\"name\":\"Teixeira Duarte Constru\u00e7\u00e3o\",\"description\":\"Pioneirismo e Inova\u00e7\u00e3o desde 1921\",\"publisher\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization\",\"name\":\"Teixeira Duarte - Engenharia e Constru\u00e7\u00f5es, S.A.\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2025\/04\/Logotipo-Teixeira-Duarte-EC-2024-positivo.png\",\"contentUrl\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2025\/04\/Logotipo-Teixeira-Duarte-EC-2024-positivo.png\",\"width\":3544,\"height\":1182,\"caption\":\"Teixeira Duarte - Engenharia e Constru\u00e7\u00f5es, S.A.\"},\"image\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/teixeiraduarteconstrucao\/?locale=pt_PT\",\"https:\/\/www.linkedin.com\/company\/teixeira-duarte-engenharia-e-construcoes\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/person\/4b4049563529446ad1d92c476be6c187\",\"name\":\"Lu\u00eds Feliciano\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/57a1e6b6efe1d3233d93e98d9da720d1fe807f6acd58df92f41e366ce1f0fdbe?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/57a1e6b6efe1d3233d93e98d9da720d1fe807f6acd58df92f41e366ce1f0fdbe?s=96&d=mm&r=g\",\"caption\":\"Lu\u00eds Feliciano\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Teixeira Duarte wins contract for road tunnel in downtown Porto - Teixeira Duarte Constru\u00e7\u00e3o","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-wins-contract-for-road-tunnel-in-downtown-porto\/","og_locale":"en_US","og_type":"article","og_title":"Teixeira Duarte wins contract for road tunnel in downtown Porto - Teixeira Duarte Constru\u00e7\u00e3o","og_description":"On 4 March, Teixeira Duarte &#8211; Engenharia e Constru\u00e7\u00f5es, S.A. (TD-EC) and Gest\u00e3o de Obras do Porto, E.M. signed a work order contract for construction of a tunnel connecting Rua do Ateneu Comercial do Porto to Rua Alexandre Braga, totalling \u20ac4,367,613.54 and due to be completed in 365 days. The works in question are part &hellip; Continue reading Teixeira Duarte wins contract for road tunnel in downtown Porto","og_url":"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-wins-contract-for-road-tunnel-in-downtown-porto\/","og_site_name":"Teixeira Duarte Constru\u00e7\u00e3o","article_publisher":"https:\/\/www.facebook.com\/teixeiraduarteconstrucao\/?locale=pt_PT","article_published_time":"2019-03-21T14:37:53+00:00","article_modified_time":"2019-08-13T08:39:12+00:00","og_image":[{"width":1920,"height":760,"url":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/05\/tunel-bolhao.jpg","type":"image\/jpeg"}],"author":"Lu\u00eds Feliciano","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Lu\u00eds Feliciano","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-wins-contract-for-road-tunnel-in-downtown-porto\/#article","isPartOf":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-wins-contract-for-road-tunnel-in-downtown-porto\/"},"author":{"name":"Lu\u00eds Feliciano","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/person\/4b4049563529446ad1d92c476be6c187"},"headline":"Teixeira Duarte wins contract for road tunnel in downtown Porto","datePublished":"2019-03-21T14:37:53+00:00","dateModified":"2019-08-13T08:39:12+00:00","mainEntityOfPage":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-wins-contract-for-road-tunnel-in-downtown-porto\/"},"wordCount":294,"publisher":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization"},"image":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-wins-contract-for-road-tunnel-in-downtown-porto\/#primaryimage"},"thumbnailUrl":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/05\/tunel-bolhao.jpg","articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-wins-contract-for-road-tunnel-in-downtown-porto\/","url":"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-wins-contract-for-road-tunnel-in-downtown-porto\/","name":"Teixeira Duarte wins contract for road tunnel in downtown Porto - Teixeira Duarte Constru\u00e7\u00e3o","isPartOf":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-wins-contract-for-road-tunnel-in-downtown-porto\/#primaryimage"},"image":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-wins-contract-for-road-tunnel-in-downtown-porto\/#primaryimage"},"thumbnailUrl":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/05\/tunel-bolhao.jpg","datePublished":"2019-03-21T14:37:53+00:00","dateModified":"2019-08-13T08:39:12+00:00","breadcrumb":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-wins-contract-for-road-tunnel-in-downtown-porto\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-wins-contract-for-road-tunnel-in-downtown-porto\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-wins-contract-for-road-tunnel-in-downtown-porto\/#primaryimage","url":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/05\/tunel-bolhao.jpg","contentUrl":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2019\/05\/tunel-bolhao.jpg","width":1920,"height":760},{"@type":"BreadcrumbList","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-wins-contract-for-road-tunnel-in-downtown-porto\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"In\u00edcio","item":"https:\/\/teixeiraduarteconstrucao.com\/en\/"},{"@type":"ListItem","position":2,"name":"Teixeira Duarte wins contract for road tunnel in downtown Porto"}]},{"@type":"WebSite","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#website","url":"https:\/\/teixeiraduarteconstrucao.com\/en\/","name":"Teixeira Duarte Constru\u00e7\u00e3o","description":"Pioneirismo e Inova\u00e7\u00e3o desde 1921","publisher":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/teixeiraduarteconstrucao.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization","name":"Teixeira Duarte - Engenharia e Constru\u00e7\u00f5es, S.A.","url":"https:\/\/teixeiraduarteconstrucao.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2025\/04\/Logotipo-Teixeira-Duarte-EC-2024-positivo.png","contentUrl":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2025\/04\/Logotipo-Teixeira-Duarte-EC-2024-positivo.png","width":3544,"height":1182,"caption":"Teixeira Duarte - Engenharia e Constru\u00e7\u00f5es, S.A."},"image":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/teixeiraduarteconstrucao\/?locale=pt_PT","https:\/\/www.linkedin.com\/company\/teixeira-duarte-engenharia-e-construcoes"]},{"@type":"Person","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/person\/4b4049563529446ad1d92c476be6c187","name":"Lu\u00eds Feliciano","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/57a1e6b6efe1d3233d93e98d9da720d1fe807f6acd58df92f41e366ce1f0fdbe?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/57a1e6b6efe1d3233d93e98d9da720d1fe807f6acd58df92f41e366ce1f0fdbe?s=96&d=mm&r=g","caption":"Lu\u00eds Feliciano"}}]}},"_links":{"self":[{"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/posts\/9154","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/comments?post=9154"}],"version-history":[{"count":0,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/posts\/9154\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/media\/9155"}],"wp:attachment":[{"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/media?parent=9154"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/categories?post=9154"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/tags?post=9154"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}