{"id":14111,"date":"2021-07-28T09:00:45","date_gmt":"2021-07-28T09:00:45","guid":{"rendered":"https:\/\/teixeiraduarteconstrucao.com\/?p=14111"},"modified":"2021-07-28T09:06:44","modified_gmt":"2021-07-28T09:06:44","slug":"somafel-and-teixeira-duarte-execute-the-biggest-new-railway-line-work-in-the-last-100-years-in-portugal","status":"publish","type":"post","link":"https:\/\/teixeiraduarteconstrucao.com\/en\/somafel-and-teixeira-duarte-execute-the-biggest-new-railway-line-work-in-the-last-100-years-in-portugal\/","title":{"rendered":"SOMAFEL and TEIXEIRA DUARTE execute the biggest new railway line work in the last 100 years in Portugal"},"content":{"rendered":"<p>The consortium led by SOMAFEL \u2013 Engenharia e Obras Ferrovi\u00e1rias, S.A. and in which Teixeira Duarte \u2013 Engenharia e Constru\u00e7\u00f5es, S.A. also participates, was awarded the contract for the Railway Track and Catenary between \u00c9vora and Elvas\/Fronteira and the construction of the subsection between \u00c9vora and \u00c9vora Norte. The work assignment was signed on 14 July at the headquarters of\u00a0<a href=\"https:\/\/www.infraestruturasdeportugal.pt\/pt-pt\/centro-de-imprensa\/nova-linha-de-evora-esta-integralmente-em-fase-de-obra\">Infraestruturas de Portugal (IP)<\/a>\u00a0for an amount of 87 million euros and provides for an execution period of 935 days.<\/p>\n<p>The contract work includes the construction of the track and catenary superstructures between \u00c9vora and Elvas\/Fronteira, and civil construction \u2013 general works \u2013 of the \u00c9vora \u2013 \u00c9vora Norte subsection, in the new \u00c9vora Line. Considered the largest new railway line work in the last 100 years in Portugal, the \u00c9vora \u2013 \u00c9vora Norte subsection is part of the new \u00c9vora Line, which is about 100 kilometres long, of which 90 kilometres are completely new, between this city and the Linha do Leste, on the connection with Spain. The work is part of the Portuguese Southern International Corridor, within the scope of the Ferrovia2020 Programme.<\/p>\n<p>The main works in the project are:<\/p>\n<ul>\n<li>Construction of a new railway channel;<\/li>\n<li>Construction of fixed electrical traction installations necessary for electrification;<\/li>\n<li>Construction of the Xarrama, Degebe and Vale Figueira railway bridges;<\/li>\n<li>Railway track, allowing for speeds of 250 km\/h;<\/li>\n<li>Catenary systems, allowing for speeds of 300 km\/h;<\/li>\n<li>Installation of the infrastructure for electronic signaling and telecommunications;<\/li>\n<li>Installation of the traction return system.<\/li>\n<\/ul>\n<p>The new railway channel under construction between \u00c9vora and the East Line, connecting to the Spanish border, was created as part of an evolutionary development of the railway connections to Spain, in the framework of the Trans-European Transport Network ( RTE-T) and of the railway connection of cargo between the Portuguese ports and the rest of Europe, ensuring from the very beginning a passenger connection.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The consortium led by SOMAFEL \u2013 Engenharia e Obras Ferrovi\u00e1rias, S.A. and in which Teixeira Duarte \u2013 Engenharia e Constru\u00e7\u00f5es, S.A. also participates, was awarded the contract for the Railway Track and Catenary between \u00c9vora and Elvas\/Fronteira and the construction of the subsection between \u00c9vora and \u00c9vora Norte. The work assignment was signed on 14 &hellip; <a href=\"https:\/\/teixeiraduarteconstrucao.com\/en\/somafel-and-teixeira-duarte-execute-the-biggest-new-railway-line-work-in-the-last-100-years-in-portugal\/\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">SOMAFEL and TEIXEIRA DUARTE execute the biggest new railway line work in the last 100 years in Portugal<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":14108,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[230],"tags":[],"class_list":["post-14111","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.7 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>SOMAFEL and TEIXEIRA DUARTE execute the biggest new railway line work in the last 100 years in Portugal - Teixeira Duarte Constru\u00e7\u00e3o<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/teixeiraduarteconstrucao.com\/en\/somafel-and-teixeira-duarte-execute-the-biggest-new-railway-line-work-in-the-last-100-years-in-portugal\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SOMAFEL and TEIXEIRA DUARTE execute the biggest new railway line work in the last 100 years in Portugal - Teixeira Duarte Constru\u00e7\u00e3o\" \/>\n<meta property=\"og:description\" content=\"The consortium led by SOMAFEL \u2013 Engenharia e Obras Ferrovi\u00e1rias, S.A. and in which Teixeira Duarte \u2013 Engenharia e Constru\u00e7\u00f5es, S.A. also participates, was awarded the contract for the Railway Track and Catenary between \u00c9vora and Elvas\/Fronteira and the construction of the subsection between \u00c9vora and \u00c9vora Norte. The work assignment was signed on 14 &hellip; Continue reading SOMAFEL and TEIXEIRA DUARTE execute the biggest new railway line work in the last 100 years in Portugal\" \/>\n<meta property=\"og:url\" content=\"https:\/\/teixeiraduarteconstrucao.com\/en\/somafel-and-teixeira-duarte-execute-the-biggest-new-railway-line-work-in-the-last-100-years-in-portugal\/\" \/>\n<meta property=\"og:site_name\" content=\"Teixeira Duarte Constru\u00e7\u00e3o\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/teixeiraduarteconstrucao\/?locale=pt_PT\" \/>\n<meta property=\"article:published_time\" content=\"2021-07-28T09:00:45+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-07-28T09:06:44+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2021\/07\/evora-elvas-somafel-ext.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1440\" \/>\n\t<meta property=\"og:image:height\" content=\"790\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Lu\u00eds Feliciano\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Lu\u00eds Feliciano\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/somafel-and-teixeira-duarte-execute-the-biggest-new-railway-line-work-in-the-last-100-years-in-portugal\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/somafel-and-teixeira-duarte-execute-the-biggest-new-railway-line-work-in-the-last-100-years-in-portugal\/\"},\"author\":{\"name\":\"Lu\u00eds Feliciano\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/person\/4b4049563529446ad1d92c476be6c187\"},\"headline\":\"SOMAFEL and TEIXEIRA DUARTE execute the biggest new railway line work in the last 100 years in Portugal\",\"datePublished\":\"2021-07-28T09:00:45+00:00\",\"dateModified\":\"2021-07-28T09:06:44+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/somafel-and-teixeira-duarte-execute-the-biggest-new-railway-line-work-in-the-last-100-years-in-portugal\/\"},\"wordCount\":323,\"publisher\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/somafel-and-teixeira-duarte-execute-the-biggest-new-railway-line-work-in-the-last-100-years-in-portugal\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2021\/07\/evora-elvas-somafel-ext.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/somafel-and-teixeira-duarte-execute-the-biggest-new-railway-line-work-in-the-last-100-years-in-portugal\/\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/somafel-and-teixeira-duarte-execute-the-biggest-new-railway-line-work-in-the-last-100-years-in-portugal\/\",\"name\":\"SOMAFEL and TEIXEIRA DUARTE execute the biggest new railway line work in the last 100 years in Portugal - Teixeira Duarte Constru\u00e7\u00e3o\",\"isPartOf\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/somafel-and-teixeira-duarte-execute-the-biggest-new-railway-line-work-in-the-last-100-years-in-portugal\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/somafel-and-teixeira-duarte-execute-the-biggest-new-railway-line-work-in-the-last-100-years-in-portugal\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2021\/07\/evora-elvas-somafel-ext.jpg\",\"datePublished\":\"2021-07-28T09:00:45+00:00\",\"dateModified\":\"2021-07-28T09:06:44+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/somafel-and-teixeira-duarte-execute-the-biggest-new-railway-line-work-in-the-last-100-years-in-portugal\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/teixeiraduarteconstrucao.com\/en\/somafel-and-teixeira-duarte-execute-the-biggest-new-railway-line-work-in-the-last-100-years-in-portugal\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/somafel-and-teixeira-duarte-execute-the-biggest-new-railway-line-work-in-the-last-100-years-in-portugal\/#primaryimage\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2021\/07\/evora-elvas-somafel-ext.jpg\",\"contentUrl\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2021\/07\/evora-elvas-somafel-ext.jpg\",\"width\":1440,\"height\":790},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/somafel-and-teixeira-duarte-execute-the-biggest-new-railway-line-work-in-the-last-100-years-in-portugal\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"In\u00edcio\",\"item\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"SOMAFEL and TEIXEIRA DUARTE execute the biggest new railway line work in the last 100 years in Portugal\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#website\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/\",\"name\":\"Teixeira Duarte Constru\u00e7\u00e3o\",\"description\":\"Pioneirismo e Inova\u00e7\u00e3o desde 1921\",\"publisher\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization\",\"name\":\"Teixeira Duarte - Engenharia e Constru\u00e7\u00f5es, S.A.\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2025\/04\/Logotipo-Teixeira-Duarte-EC-2024-positivo.png\",\"contentUrl\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2025\/04\/Logotipo-Teixeira-Duarte-EC-2024-positivo.png\",\"width\":3544,\"height\":1182,\"caption\":\"Teixeira Duarte - Engenharia e Constru\u00e7\u00f5es, S.A.\"},\"image\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/teixeiraduarteconstrucao\/?locale=pt_PT\",\"https:\/\/www.linkedin.com\/company\/teixeira-duarte-engenharia-e-construcoes\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/person\/4b4049563529446ad1d92c476be6c187\",\"name\":\"Lu\u00eds Feliciano\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/57a1e6b6efe1d3233d93e98d9da720d1fe807f6acd58df92f41e366ce1f0fdbe?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/57a1e6b6efe1d3233d93e98d9da720d1fe807f6acd58df92f41e366ce1f0fdbe?s=96&d=mm&r=g\",\"caption\":\"Lu\u00eds Feliciano\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"SOMAFEL and TEIXEIRA DUARTE execute the biggest new railway line work in the last 100 years in Portugal - Teixeira Duarte Constru\u00e7\u00e3o","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/teixeiraduarteconstrucao.com\/en\/somafel-and-teixeira-duarte-execute-the-biggest-new-railway-line-work-in-the-last-100-years-in-portugal\/","og_locale":"en_US","og_type":"article","og_title":"SOMAFEL and TEIXEIRA DUARTE execute the biggest new railway line work in the last 100 years in Portugal - Teixeira Duarte Constru\u00e7\u00e3o","og_description":"The consortium led by SOMAFEL \u2013 Engenharia e Obras Ferrovi\u00e1rias, S.A. and in which Teixeira Duarte \u2013 Engenharia e Constru\u00e7\u00f5es, S.A. also participates, was awarded the contract for the Railway Track and Catenary between \u00c9vora and Elvas\/Fronteira and the construction of the subsection between \u00c9vora and \u00c9vora Norte. The work assignment was signed on 14 &hellip; Continue reading SOMAFEL and TEIXEIRA DUARTE execute the biggest new railway line work in the last 100 years in Portugal","og_url":"https:\/\/teixeiraduarteconstrucao.com\/en\/somafel-and-teixeira-duarte-execute-the-biggest-new-railway-line-work-in-the-last-100-years-in-portugal\/","og_site_name":"Teixeira Duarte Constru\u00e7\u00e3o","article_publisher":"https:\/\/www.facebook.com\/teixeiraduarteconstrucao\/?locale=pt_PT","article_published_time":"2021-07-28T09:00:45+00:00","article_modified_time":"2021-07-28T09:06:44+00:00","og_image":[{"width":1440,"height":790,"url":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2021\/07\/evora-elvas-somafel-ext.jpg","type":"image\/jpeg"}],"author":"Lu\u00eds Feliciano","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Lu\u00eds Feliciano","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/somafel-and-teixeira-duarte-execute-the-biggest-new-railway-line-work-in-the-last-100-years-in-portugal\/#article","isPartOf":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/somafel-and-teixeira-duarte-execute-the-biggest-new-railway-line-work-in-the-last-100-years-in-portugal\/"},"author":{"name":"Lu\u00eds Feliciano","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/person\/4b4049563529446ad1d92c476be6c187"},"headline":"SOMAFEL and TEIXEIRA DUARTE execute the biggest new railway line work in the last 100 years in Portugal","datePublished":"2021-07-28T09:00:45+00:00","dateModified":"2021-07-28T09:06:44+00:00","mainEntityOfPage":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/somafel-and-teixeira-duarte-execute-the-biggest-new-railway-line-work-in-the-last-100-years-in-portugal\/"},"wordCount":323,"publisher":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization"},"image":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/somafel-and-teixeira-duarte-execute-the-biggest-new-railway-line-work-in-the-last-100-years-in-portugal\/#primaryimage"},"thumbnailUrl":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2021\/07\/evora-elvas-somafel-ext.jpg","articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/somafel-and-teixeira-duarte-execute-the-biggest-new-railway-line-work-in-the-last-100-years-in-portugal\/","url":"https:\/\/teixeiraduarteconstrucao.com\/en\/somafel-and-teixeira-duarte-execute-the-biggest-new-railway-line-work-in-the-last-100-years-in-portugal\/","name":"SOMAFEL and TEIXEIRA DUARTE execute the biggest new railway line work in the last 100 years in Portugal - Teixeira Duarte Constru\u00e7\u00e3o","isPartOf":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/somafel-and-teixeira-duarte-execute-the-biggest-new-railway-line-work-in-the-last-100-years-in-portugal\/#primaryimage"},"image":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/somafel-and-teixeira-duarte-execute-the-biggest-new-railway-line-work-in-the-last-100-years-in-portugal\/#primaryimage"},"thumbnailUrl":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2021\/07\/evora-elvas-somafel-ext.jpg","datePublished":"2021-07-28T09:00:45+00:00","dateModified":"2021-07-28T09:06:44+00:00","breadcrumb":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/somafel-and-teixeira-duarte-execute-the-biggest-new-railway-line-work-in-the-last-100-years-in-portugal\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/teixeiraduarteconstrucao.com\/en\/somafel-and-teixeira-duarte-execute-the-biggest-new-railway-line-work-in-the-last-100-years-in-portugal\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/somafel-and-teixeira-duarte-execute-the-biggest-new-railway-line-work-in-the-last-100-years-in-portugal\/#primaryimage","url":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2021\/07\/evora-elvas-somafel-ext.jpg","contentUrl":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2021\/07\/evora-elvas-somafel-ext.jpg","width":1440,"height":790},{"@type":"BreadcrumbList","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/somafel-and-teixeira-duarte-execute-the-biggest-new-railway-line-work-in-the-last-100-years-in-portugal\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"In\u00edcio","item":"https:\/\/teixeiraduarteconstrucao.com\/en\/"},{"@type":"ListItem","position":2,"name":"SOMAFEL and TEIXEIRA DUARTE execute the biggest new railway line work in the last 100 years in Portugal"}]},{"@type":"WebSite","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#website","url":"https:\/\/teixeiraduarteconstrucao.com\/en\/","name":"Teixeira Duarte Constru\u00e7\u00e3o","description":"Pioneirismo e Inova\u00e7\u00e3o desde 1921","publisher":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/teixeiraduarteconstrucao.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization","name":"Teixeira Duarte - Engenharia e Constru\u00e7\u00f5es, S.A.","url":"https:\/\/teixeiraduarteconstrucao.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2025\/04\/Logotipo-Teixeira-Duarte-EC-2024-positivo.png","contentUrl":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2025\/04\/Logotipo-Teixeira-Duarte-EC-2024-positivo.png","width":3544,"height":1182,"caption":"Teixeira Duarte - Engenharia e Constru\u00e7\u00f5es, S.A."},"image":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/teixeiraduarteconstrucao\/?locale=pt_PT","https:\/\/www.linkedin.com\/company\/teixeira-duarte-engenharia-e-construcoes"]},{"@type":"Person","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/person\/4b4049563529446ad1d92c476be6c187","name":"Lu\u00eds Feliciano","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/57a1e6b6efe1d3233d93e98d9da720d1fe807f6acd58df92f41e366ce1f0fdbe?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/57a1e6b6efe1d3233d93e98d9da720d1fe807f6acd58df92f41e366ce1f0fdbe?s=96&d=mm&r=g","caption":"Lu\u00eds Feliciano"}}]}},"_links":{"self":[{"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/posts\/14111","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/comments?post=14111"}],"version-history":[{"count":0,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/posts\/14111\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/media\/14108"}],"wp:attachment":[{"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/media?parent=14111"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/categories?post=14111"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/tags?post=14111"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}