{"id":13957,"date":"2020-12-21T10:45:13","date_gmt":"2020-12-21T10:45:13","guid":{"rendered":"https:\/\/teixeiraduarteconstrucao.com\/teixeira-duarte-assina-contrato-de-empreitada-para-prolongamento-do-quebra-mar-do-porto-de-leixoes\/"},"modified":"2020-12-21T11:00:07","modified_gmt":"2020-12-21T11:00:07","slug":"teixeira-duarte-assina-contrato-de-empreitada-para-prolongamento-do-quebra-mar-do-porto-de-leixoes","status":"publish","type":"post","link":"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-assina-contrato-de-empreitada-para-prolongamento-do-quebra-mar-do-porto-de-leixoes\/","title":{"rendered":"Teixeira Duarte signs contract for the extension of the Leix\u00f5es Port Breakwater"},"content":{"rendered":"<p>Last December 15th, Teixeira Duarte &#8211; Engenharia e Constru\u00e7\u00f5es, S.A. signed the contract for the execution, in consortium with the companies Dredging International NV and Tecnovia, S.A., of the Contract for the Exterior Breakwater Extension and Maritime Accessibility of the Port of Leix\u00f5es, for the <a href=\"https:\/\/www.apdl.pt\/en_US\/header\">Administration of Douro, Leix\u00f5es and Viana do Castelo Ports<\/a> (APDL).<\/p>\n<p>Teixeira Duarte will be the leading company in the consortium with a 40% stake.<\/p>\n<p>The work, which will allow the Port of Leix\u00f5es to receive more than 70% of the world&#8217;s fleet of ships and continue to serve the hinterland, which covers 14 million inhabitants, has a 30-month execution period and was awarded for 130.2 million Euros.<\/p>\n<p>The contract basically integrates three fronts of action:<\/p>\n<ul>\n<li>Exterior Breakwater Extension, in an extension of 300 m, composed of a conventional structural solution of the breakwater of slopes, composed of core and rockfill filters and protection blankets of antifer concrete blocks;<\/li>\n<li>Marine Accessibilities, contemplating the deepening of the access channel and the rotation basin by dredging of incoherent and rocky material, besides the partial demolition of the North Breakwater in an extension of 80 m and the reconditioning of its forehead in a receding position;<\/li>\n<li>Repair of the Technical Gutter, between the rooting of the Outer Breakwater and the A Station, an organ dedicated to the passage of pipes of the Leix\u00f5es Oil Terminal (TPL).<\/li>\n<\/ul>\n<p>According to APDL, the average size of the ships seeking the Port of Leix\u00f5es has been growing &#8211; an increase of 77% between 2006 and 2018 &#8211; and it is essential to ensure the safety and navigability of these vessels.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Last December 15th, Teixeira Duarte &#8211; Engenharia e Constru\u00e7\u00f5es, S.A. signed the contract for the execution, in consortium with the companies Dredging International NV and Tecnovia, S.A., of the Contract for the Exterior Breakwater Extension and Maritime Accessibility of the Port of Leix\u00f5es, for the Administration of Douro, Leix\u00f5es and Viana do Castelo Ports (APDL). &hellip; <a href=\"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-assina-contrato-de-empreitada-para-prolongamento-do-quebra-mar-do-porto-de-leixoes\/\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">Teixeira Duarte signs contract for the extension of the Leix\u00f5es Port Breakwater<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":13955,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[230],"tags":[],"class_list":["post-13957","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.7 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Teixeira Duarte signs contract for the extension of the Leix\u00f5es Port Breakwater - Teixeira Duarte Constru\u00e7\u00e3o<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-assina-contrato-de-empreitada-para-prolongamento-do-quebra-mar-do-porto-de-leixoes\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Teixeira Duarte signs contract for the extension of the Leix\u00f5es Port Breakwater - Teixeira Duarte Constru\u00e7\u00e3o\" \/>\n<meta property=\"og:description\" content=\"Last December 15th, Teixeira Duarte &#8211; Engenharia e Constru\u00e7\u00f5es, S.A. signed the contract for the execution, in consortium with the companies Dredging International NV and Tecnovia, S.A., of the Contract for the Exterior Breakwater Extension and Maritime Accessibility of the Port of Leix\u00f5es, for the Administration of Douro, Leix\u00f5es and Viana do Castelo Ports (APDL). &hellip; Continue reading Teixeira Duarte signs contract for the extension of the Leix\u00f5es Port Breakwater\" \/>\n<meta property=\"og:url\" content=\"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-assina-contrato-de-empreitada-para-prolongamento-do-quebra-mar-do-porto-de-leixoes\/\" \/>\n<meta property=\"og:site_name\" content=\"Teixeira Duarte Constru\u00e7\u00e3o\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/teixeiraduarteconstrucao\/?locale=pt_PT\" \/>\n<meta property=\"article:published_time\" content=\"2020-12-21T10:45:13+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-12-21T11:00:07+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2020\/12\/Teixeira-Duarte-assina-contrato-de-Empreitada-para-Prolongamento-do-Quebra-Mar-do-Porto-de-Leix\u00f5es.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"760\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Lu\u00eds Feliciano\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Lu\u00eds Feliciano\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-assina-contrato-de-empreitada-para-prolongamento-do-quebra-mar-do-porto-de-leixoes\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-assina-contrato-de-empreitada-para-prolongamento-do-quebra-mar-do-porto-de-leixoes\/\"},\"author\":{\"name\":\"Lu\u00eds Feliciano\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/person\/4b4049563529446ad1d92c476be6c187\"},\"headline\":\"Teixeira Duarte signs contract for the extension of the Leix\u00f5es Port Breakwater\",\"datePublished\":\"2020-12-21T10:45:13+00:00\",\"dateModified\":\"2020-12-21T11:00:07+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-assina-contrato-de-empreitada-para-prolongamento-do-quebra-mar-do-porto-de-leixoes\/\"},\"wordCount\":279,\"publisher\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-assina-contrato-de-empreitada-para-prolongamento-do-quebra-mar-do-porto-de-leixoes\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2020\/12\/Teixeira-Duarte-assina-contrato-de-Empreitada-para-Prolongamento-do-Quebra-Mar-do-Porto-de-Leix\u00f5es.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-assina-contrato-de-empreitada-para-prolongamento-do-quebra-mar-do-porto-de-leixoes\/\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-assina-contrato-de-empreitada-para-prolongamento-do-quebra-mar-do-porto-de-leixoes\/\",\"name\":\"Teixeira Duarte signs contract for the extension of the Leix\u00f5es Port Breakwater - Teixeira Duarte Constru\u00e7\u00e3o\",\"isPartOf\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-assina-contrato-de-empreitada-para-prolongamento-do-quebra-mar-do-porto-de-leixoes\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-assina-contrato-de-empreitada-para-prolongamento-do-quebra-mar-do-porto-de-leixoes\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2020\/12\/Teixeira-Duarte-assina-contrato-de-Empreitada-para-Prolongamento-do-Quebra-Mar-do-Porto-de-Leix\u00f5es.jpg\",\"datePublished\":\"2020-12-21T10:45:13+00:00\",\"dateModified\":\"2020-12-21T11:00:07+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-assina-contrato-de-empreitada-para-prolongamento-do-quebra-mar-do-porto-de-leixoes\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-assina-contrato-de-empreitada-para-prolongamento-do-quebra-mar-do-porto-de-leixoes\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-assina-contrato-de-empreitada-para-prolongamento-do-quebra-mar-do-porto-de-leixoes\/#primaryimage\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2020\/12\/Teixeira-Duarte-assina-contrato-de-Empreitada-para-Prolongamento-do-Quebra-Mar-do-Porto-de-Leix\u00f5es.jpg\",\"contentUrl\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2020\/12\/Teixeira-Duarte-assina-contrato-de-Empreitada-para-Prolongamento-do-Quebra-Mar-do-Porto-de-Leix\u00f5es.jpg\",\"width\":1920,\"height\":760},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-assina-contrato-de-empreitada-para-prolongamento-do-quebra-mar-do-porto-de-leixoes\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"In\u00edcio\",\"item\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Teixeira Duarte signs contract for the extension of the Leix\u00f5es Port Breakwater\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#website\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/\",\"name\":\"Teixeira Duarte Constru\u00e7\u00e3o\",\"description\":\"Pioneirismo e Inova\u00e7\u00e3o desde 1921\",\"publisher\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization\",\"name\":\"Teixeira Duarte - Engenharia e Constru\u00e7\u00f5es, S.A.\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2025\/04\/Logotipo-Teixeira-Duarte-EC-2024-positivo.png\",\"contentUrl\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2025\/04\/Logotipo-Teixeira-Duarte-EC-2024-positivo.png\",\"width\":3544,\"height\":1182,\"caption\":\"Teixeira Duarte - Engenharia e Constru\u00e7\u00f5es, S.A.\"},\"image\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/teixeiraduarteconstrucao\/?locale=pt_PT\",\"https:\/\/www.linkedin.com\/company\/teixeira-duarte-engenharia-e-construcoes\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/person\/4b4049563529446ad1d92c476be6c187\",\"name\":\"Lu\u00eds Feliciano\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/57a1e6b6efe1d3233d93e98d9da720d1fe807f6acd58df92f41e366ce1f0fdbe?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/57a1e6b6efe1d3233d93e98d9da720d1fe807f6acd58df92f41e366ce1f0fdbe?s=96&d=mm&r=g\",\"caption\":\"Lu\u00eds Feliciano\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Teixeira Duarte signs contract for the extension of the Leix\u00f5es Port Breakwater - Teixeira Duarte Constru\u00e7\u00e3o","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-assina-contrato-de-empreitada-para-prolongamento-do-quebra-mar-do-porto-de-leixoes\/","og_locale":"en_US","og_type":"article","og_title":"Teixeira Duarte signs contract for the extension of the Leix\u00f5es Port Breakwater - Teixeira Duarte Constru\u00e7\u00e3o","og_description":"Last December 15th, Teixeira Duarte &#8211; Engenharia e Constru\u00e7\u00f5es, S.A. signed the contract for the execution, in consortium with the companies Dredging International NV and Tecnovia, S.A., of the Contract for the Exterior Breakwater Extension and Maritime Accessibility of the Port of Leix\u00f5es, for the Administration of Douro, Leix\u00f5es and Viana do Castelo Ports (APDL). &hellip; Continue reading Teixeira Duarte signs contract for the extension of the Leix\u00f5es Port Breakwater","og_url":"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-assina-contrato-de-empreitada-para-prolongamento-do-quebra-mar-do-porto-de-leixoes\/","og_site_name":"Teixeira Duarte Constru\u00e7\u00e3o","article_publisher":"https:\/\/www.facebook.com\/teixeiraduarteconstrucao\/?locale=pt_PT","article_published_time":"2020-12-21T10:45:13+00:00","article_modified_time":"2020-12-21T11:00:07+00:00","og_image":[{"width":1920,"height":760,"url":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2020\/12\/Teixeira-Duarte-assina-contrato-de-Empreitada-para-Prolongamento-do-Quebra-Mar-do-Porto-de-Leix\u00f5es.jpg","type":"image\/jpeg"}],"author":"Lu\u00eds Feliciano","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Lu\u00eds Feliciano","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-assina-contrato-de-empreitada-para-prolongamento-do-quebra-mar-do-porto-de-leixoes\/#article","isPartOf":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-assina-contrato-de-empreitada-para-prolongamento-do-quebra-mar-do-porto-de-leixoes\/"},"author":{"name":"Lu\u00eds Feliciano","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/person\/4b4049563529446ad1d92c476be6c187"},"headline":"Teixeira Duarte signs contract for the extension of the Leix\u00f5es Port Breakwater","datePublished":"2020-12-21T10:45:13+00:00","dateModified":"2020-12-21T11:00:07+00:00","mainEntityOfPage":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-assina-contrato-de-empreitada-para-prolongamento-do-quebra-mar-do-porto-de-leixoes\/"},"wordCount":279,"publisher":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization"},"image":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-assina-contrato-de-empreitada-para-prolongamento-do-quebra-mar-do-porto-de-leixoes\/#primaryimage"},"thumbnailUrl":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2020\/12\/Teixeira-Duarte-assina-contrato-de-Empreitada-para-Prolongamento-do-Quebra-Mar-do-Porto-de-Leix\u00f5es.jpg","articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-assina-contrato-de-empreitada-para-prolongamento-do-quebra-mar-do-porto-de-leixoes\/","url":"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-assina-contrato-de-empreitada-para-prolongamento-do-quebra-mar-do-porto-de-leixoes\/","name":"Teixeira Duarte signs contract for the extension of the Leix\u00f5es Port Breakwater - Teixeira Duarte Constru\u00e7\u00e3o","isPartOf":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-assina-contrato-de-empreitada-para-prolongamento-do-quebra-mar-do-porto-de-leixoes\/#primaryimage"},"image":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-assina-contrato-de-empreitada-para-prolongamento-do-quebra-mar-do-porto-de-leixoes\/#primaryimage"},"thumbnailUrl":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2020\/12\/Teixeira-Duarte-assina-contrato-de-Empreitada-para-Prolongamento-do-Quebra-Mar-do-Porto-de-Leix\u00f5es.jpg","datePublished":"2020-12-21T10:45:13+00:00","dateModified":"2020-12-21T11:00:07+00:00","breadcrumb":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-assina-contrato-de-empreitada-para-prolongamento-do-quebra-mar-do-porto-de-leixoes\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-assina-contrato-de-empreitada-para-prolongamento-do-quebra-mar-do-porto-de-leixoes\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-assina-contrato-de-empreitada-para-prolongamento-do-quebra-mar-do-porto-de-leixoes\/#primaryimage","url":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2020\/12\/Teixeira-Duarte-assina-contrato-de-Empreitada-para-Prolongamento-do-Quebra-Mar-do-Porto-de-Leix\u00f5es.jpg","contentUrl":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2020\/12\/Teixeira-Duarte-assina-contrato-de-Empreitada-para-Prolongamento-do-Quebra-Mar-do-Porto-de-Leix\u00f5es.jpg","width":1920,"height":760},{"@type":"BreadcrumbList","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-assina-contrato-de-empreitada-para-prolongamento-do-quebra-mar-do-porto-de-leixoes\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"In\u00edcio","item":"https:\/\/teixeiraduarteconstrucao.com\/en\/"},{"@type":"ListItem","position":2,"name":"Teixeira Duarte signs contract for the extension of the Leix\u00f5es Port Breakwater"}]},{"@type":"WebSite","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#website","url":"https:\/\/teixeiraduarteconstrucao.com\/en\/","name":"Teixeira Duarte Constru\u00e7\u00e3o","description":"Pioneirismo e Inova\u00e7\u00e3o desde 1921","publisher":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/teixeiraduarteconstrucao.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization","name":"Teixeira Duarte - Engenharia e Constru\u00e7\u00f5es, S.A.","url":"https:\/\/teixeiraduarteconstrucao.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2025\/04\/Logotipo-Teixeira-Duarte-EC-2024-positivo.png","contentUrl":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2025\/04\/Logotipo-Teixeira-Duarte-EC-2024-positivo.png","width":3544,"height":1182,"caption":"Teixeira Duarte - Engenharia e Constru\u00e7\u00f5es, S.A."},"image":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/teixeiraduarteconstrucao\/?locale=pt_PT","https:\/\/www.linkedin.com\/company\/teixeira-duarte-engenharia-e-construcoes"]},{"@type":"Person","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/person\/4b4049563529446ad1d92c476be6c187","name":"Lu\u00eds Feliciano","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/57a1e6b6efe1d3233d93e98d9da720d1fe807f6acd58df92f41e366ce1f0fdbe?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/57a1e6b6efe1d3233d93e98d9da720d1fe807f6acd58df92f41e366ce1f0fdbe?s=96&d=mm&r=g","caption":"Lu\u00eds Feliciano"}}]}},"_links":{"self":[{"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/posts\/13957","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/comments?post=13957"}],"version-history":[{"count":0,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/posts\/13957\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/media\/13955"}],"wp:attachment":[{"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/media?parent=13957"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/categories?post=13957"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/tags?post=13957"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}