{"id":13851,"date":"2020-11-10T16:22:02","date_gmt":"2020-11-10T16:22:02","guid":{"rendered":"https:\/\/teixeiraduarteconstrucao.com\/?p=13851"},"modified":"2020-11-24T17:56:32","modified_gmt":"2020-11-24T17:56:32","slug":"teixeira-duarte-finishes-the-rehabilitation-work-of-the-north-pier-of-the-port-of-viana-do-castelo","status":"publish","type":"post","link":"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-finishes-the-rehabilitation-work-of-the-north-pier-of-the-port-of-viana-do-castelo\/","title":{"rendered":"Teixeira Duarte finishes the rehabilitation work of the North Pier of the Port of Viana do Castelo"},"content":{"rendered":"<p><span data-preserver-spaces=\"true\">Teixeira Duarte &#8211; Engenharia e Constru\u00e7\u00f5es, S.A. concluded, last October, the &#8220;Repair and Reinforcement Contract of the North Pier of the Port of Viana do Castelo<\/span><strong><span data-preserver-spaces=\"true\">\u00a0<\/span><\/strong><span data-preserver-spaces=\"true\">between PK 880 and PK 1150&#8243;.<\/span><\/p>\n<p><span data-preserver-spaces=\"true\">With 2,170 meters in length, the North Pier &#8211; for the protection of the Port of Viana do Castelo &#8211; is a structure of downloadable slopes, which has a concrete walkway. The contract included the reinforcement of the existing slopes and the repair of the concrete sidewalk in all extensions damaged as a result of the bad weather.<\/span><\/p>\n<p><span data-preserver-spaces=\"true\">This contract was the first of four interventions planned for the rehabilitation of the mentioned Pier, being of extreme importance, because it mainly ensures the safety issues of this port infrastructure, with growing importance in the economic activity of Portugal and the northwest of the Iberian Peninsula.<\/span><\/p>\n<p><span data-preserver-spaces=\"true\">The work, under the responsibility of the Geotechnics and Rehabilitation | Maritime works of Teixeira Duarte &#8211; Engenharia e Constru\u00e7\u00f5es, S.A., was completed on time and within budget, also contributing to customer satisfaction.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Teixeira Duarte &#8211; Engenharia e Constru\u00e7\u00f5es, S.A. concluded, last October, the &#8220;Repair and Reinforcement Contract of the North Pier of the Port of Viana do Castelo\u00a0between PK 880 and PK 1150&#8243;. With 2,170 meters in length, the North Pier &#8211; for the protection of the Port of Viana do Castelo &#8211; is a structure of &hellip; <a href=\"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-finishes-the-rehabilitation-work-of-the-north-pier-of-the-port-of-viana-do-castelo\/\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">Teixeira Duarte finishes the rehabilitation work of the North Pier of the Port of Viana do Castelo<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":13846,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"video","meta":{"footnotes":""},"categories":[230],"tags":[],"class_list":["post-13851","post","type-post","status-publish","format-video","has-post-thumbnail","hentry","category-news","post_format-post-format-video"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.7 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Teixeira Duarte finishes the rehabilitation work of the North Pier of the Port of Viana do Castelo - Teixeira Duarte Constru\u00e7\u00e3o<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-finishes-the-rehabilitation-work-of-the-north-pier-of-the-port-of-viana-do-castelo\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Teixeira Duarte finishes the rehabilitation work of the North Pier of the Port of Viana do Castelo - Teixeira Duarte Constru\u00e7\u00e3o\" \/>\n<meta property=\"og:description\" content=\"Teixeira Duarte &#8211; Engenharia e Constru\u00e7\u00f5es, S.A. concluded, last October, the &#8220;Repair and Reinforcement Contract of the North Pier of the Port of Viana do Castelo\u00a0between PK 880 and PK 1150&#8243;. With 2,170 meters in length, the North Pier &#8211; for the protection of the Port of Viana do Castelo &#8211; is a structure of &hellip; Continue reading Teixeira Duarte finishes the rehabilitation work of the North Pier of the Port of Viana do Castelo\" \/>\n<meta property=\"og:url\" content=\"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-finishes-the-rehabilitation-work-of-the-north-pier-of-the-port-of-viana-do-castelo\/\" \/>\n<meta property=\"og:site_name\" content=\"Teixeira Duarte Constru\u00e7\u00e3o\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/teixeiraduarteconstrucao\/?locale=pt_PT\" \/>\n<meta property=\"article:published_time\" content=\"2020-11-10T16:22:02+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-11-24T17:56:32+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2020\/11\/Viana.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1280\" \/>\n\t<meta property=\"og:image:height\" content=\"720\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Lu\u00eds Feliciano\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Lu\u00eds Feliciano\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-finishes-the-rehabilitation-work-of-the-north-pier-of-the-port-of-viana-do-castelo\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-finishes-the-rehabilitation-work-of-the-north-pier-of-the-port-of-viana-do-castelo\/\"},\"author\":{\"name\":\"Lu\u00eds Feliciano\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/person\/4b4049563529446ad1d92c476be6c187\"},\"headline\":\"Teixeira Duarte finishes the rehabilitation work of the North Pier of the Port of Viana do Castelo\",\"datePublished\":\"2020-11-10T16:22:02+00:00\",\"dateModified\":\"2020-11-24T17:56:32+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-finishes-the-rehabilitation-work-of-the-north-pier-of-the-port-of-viana-do-castelo\/\"},\"wordCount\":187,\"publisher\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-finishes-the-rehabilitation-work-of-the-north-pier-of-the-port-of-viana-do-castelo\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2020\/11\/Viana.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-finishes-the-rehabilitation-work-of-the-north-pier-of-the-port-of-viana-do-castelo\/\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-finishes-the-rehabilitation-work-of-the-north-pier-of-the-port-of-viana-do-castelo\/\",\"name\":\"Teixeira Duarte finishes the rehabilitation work of the North Pier of the Port of Viana do Castelo - Teixeira Duarte Constru\u00e7\u00e3o\",\"isPartOf\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-finishes-the-rehabilitation-work-of-the-north-pier-of-the-port-of-viana-do-castelo\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-finishes-the-rehabilitation-work-of-the-north-pier-of-the-port-of-viana-do-castelo\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2020\/11\/Viana.jpg\",\"datePublished\":\"2020-11-10T16:22:02+00:00\",\"dateModified\":\"2020-11-24T17:56:32+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-finishes-the-rehabilitation-work-of-the-north-pier-of-the-port-of-viana-do-castelo\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-finishes-the-rehabilitation-work-of-the-north-pier-of-the-port-of-viana-do-castelo\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-finishes-the-rehabilitation-work-of-the-north-pier-of-the-port-of-viana-do-castelo\/#primaryimage\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2020\/11\/Viana.jpg\",\"contentUrl\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2020\/11\/Viana.jpg\",\"width\":1280,\"height\":720},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-finishes-the-rehabilitation-work-of-the-north-pier-of-the-port-of-viana-do-castelo\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"In\u00edcio\",\"item\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Teixeira Duarte finishes the rehabilitation work of the North Pier of the Port of Viana do Castelo\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#website\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/\",\"name\":\"Teixeira Duarte Constru\u00e7\u00e3o\",\"description\":\"Pioneirismo e Inova\u00e7\u00e3o desde 1921\",\"publisher\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization\",\"name\":\"Teixeira Duarte - Engenharia e Constru\u00e7\u00f5es, S.A.\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2025\/04\/Logotipo-Teixeira-Duarte-EC-2024-positivo.png\",\"contentUrl\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2025\/04\/Logotipo-Teixeira-Duarte-EC-2024-positivo.png\",\"width\":3544,\"height\":1182,\"caption\":\"Teixeira Duarte - Engenharia e Constru\u00e7\u00f5es, S.A.\"},\"image\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/teixeiraduarteconstrucao\/?locale=pt_PT\",\"https:\/\/www.linkedin.com\/company\/teixeira-duarte-engenharia-e-construcoes\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/person\/4b4049563529446ad1d92c476be6c187\",\"name\":\"Lu\u00eds Feliciano\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/57a1e6b6efe1d3233d93e98d9da720d1fe807f6acd58df92f41e366ce1f0fdbe?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/57a1e6b6efe1d3233d93e98d9da720d1fe807f6acd58df92f41e366ce1f0fdbe?s=96&d=mm&r=g\",\"caption\":\"Lu\u00eds Feliciano\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Teixeira Duarte finishes the rehabilitation work of the North Pier of the Port of Viana do Castelo - Teixeira Duarte Constru\u00e7\u00e3o","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-finishes-the-rehabilitation-work-of-the-north-pier-of-the-port-of-viana-do-castelo\/","og_locale":"en_US","og_type":"article","og_title":"Teixeira Duarte finishes the rehabilitation work of the North Pier of the Port of Viana do Castelo - Teixeira Duarte Constru\u00e7\u00e3o","og_description":"Teixeira Duarte &#8211; Engenharia e Constru\u00e7\u00f5es, S.A. concluded, last October, the &#8220;Repair and Reinforcement Contract of the North Pier of the Port of Viana do Castelo\u00a0between PK 880 and PK 1150&#8243;. With 2,170 meters in length, the North Pier &#8211; for the protection of the Port of Viana do Castelo &#8211; is a structure of &hellip; Continue reading Teixeira Duarte finishes the rehabilitation work of the North Pier of the Port of Viana do Castelo","og_url":"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-finishes-the-rehabilitation-work-of-the-north-pier-of-the-port-of-viana-do-castelo\/","og_site_name":"Teixeira Duarte Constru\u00e7\u00e3o","article_publisher":"https:\/\/www.facebook.com\/teixeiraduarteconstrucao\/?locale=pt_PT","article_published_time":"2020-11-10T16:22:02+00:00","article_modified_time":"2020-11-24T17:56:32+00:00","og_image":[{"width":1280,"height":720,"url":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2020\/11\/Viana.jpg","type":"image\/jpeg"}],"author":"Lu\u00eds Feliciano","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Lu\u00eds Feliciano","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-finishes-the-rehabilitation-work-of-the-north-pier-of-the-port-of-viana-do-castelo\/#article","isPartOf":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-finishes-the-rehabilitation-work-of-the-north-pier-of-the-port-of-viana-do-castelo\/"},"author":{"name":"Lu\u00eds Feliciano","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/person\/4b4049563529446ad1d92c476be6c187"},"headline":"Teixeira Duarte finishes the rehabilitation work of the North Pier of the Port of Viana do Castelo","datePublished":"2020-11-10T16:22:02+00:00","dateModified":"2020-11-24T17:56:32+00:00","mainEntityOfPage":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-finishes-the-rehabilitation-work-of-the-north-pier-of-the-port-of-viana-do-castelo\/"},"wordCount":187,"publisher":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization"},"image":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-finishes-the-rehabilitation-work-of-the-north-pier-of-the-port-of-viana-do-castelo\/#primaryimage"},"thumbnailUrl":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2020\/11\/Viana.jpg","articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-finishes-the-rehabilitation-work-of-the-north-pier-of-the-port-of-viana-do-castelo\/","url":"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-finishes-the-rehabilitation-work-of-the-north-pier-of-the-port-of-viana-do-castelo\/","name":"Teixeira Duarte finishes the rehabilitation work of the North Pier of the Port of Viana do Castelo - Teixeira Duarte Constru\u00e7\u00e3o","isPartOf":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-finishes-the-rehabilitation-work-of-the-north-pier-of-the-port-of-viana-do-castelo\/#primaryimage"},"image":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-finishes-the-rehabilitation-work-of-the-north-pier-of-the-port-of-viana-do-castelo\/#primaryimage"},"thumbnailUrl":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2020\/11\/Viana.jpg","datePublished":"2020-11-10T16:22:02+00:00","dateModified":"2020-11-24T17:56:32+00:00","breadcrumb":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-finishes-the-rehabilitation-work-of-the-north-pier-of-the-port-of-viana-do-castelo\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-finishes-the-rehabilitation-work-of-the-north-pier-of-the-port-of-viana-do-castelo\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-finishes-the-rehabilitation-work-of-the-north-pier-of-the-port-of-viana-do-castelo\/#primaryimage","url":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2020\/11\/Viana.jpg","contentUrl":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2020\/11\/Viana.jpg","width":1280,"height":720},{"@type":"BreadcrumbList","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/teixeira-duarte-finishes-the-rehabilitation-work-of-the-north-pier-of-the-port-of-viana-do-castelo\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"In\u00edcio","item":"https:\/\/teixeiraduarteconstrucao.com\/en\/"},{"@type":"ListItem","position":2,"name":"Teixeira Duarte finishes the rehabilitation work of the North Pier of the Port of Viana do Castelo"}]},{"@type":"WebSite","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#website","url":"https:\/\/teixeiraduarteconstrucao.com\/en\/","name":"Teixeira Duarte Constru\u00e7\u00e3o","description":"Pioneirismo e Inova\u00e7\u00e3o desde 1921","publisher":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/teixeiraduarteconstrucao.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization","name":"Teixeira Duarte - Engenharia e Constru\u00e7\u00f5es, S.A.","url":"https:\/\/teixeiraduarteconstrucao.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2025\/04\/Logotipo-Teixeira-Duarte-EC-2024-positivo.png","contentUrl":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2025\/04\/Logotipo-Teixeira-Duarte-EC-2024-positivo.png","width":3544,"height":1182,"caption":"Teixeira Duarte - Engenharia e Constru\u00e7\u00f5es, S.A."},"image":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/teixeiraduarteconstrucao\/?locale=pt_PT","https:\/\/www.linkedin.com\/company\/teixeira-duarte-engenharia-e-construcoes"]},{"@type":"Person","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/person\/4b4049563529446ad1d92c476be6c187","name":"Lu\u00eds Feliciano","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/57a1e6b6efe1d3233d93e98d9da720d1fe807f6acd58df92f41e366ce1f0fdbe?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/57a1e6b6efe1d3233d93e98d9da720d1fe807f6acd58df92f41e366ce1f0fdbe?s=96&d=mm&r=g","caption":"Lu\u00eds Feliciano"}}]}},"_links":{"self":[{"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/posts\/13851","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/comments?post=13851"}],"version-history":[{"count":0,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/posts\/13851\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/media\/13846"}],"wp:attachment":[{"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/media?parent=13851"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/categories?post=13851"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/tags?post=13851"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}